3-2
122990-172
Installation Instructions
Installation/Uncrating Instructions
5.
WASTE - Connect washer/disinfector drain line to building
waste line.
6.
VENTILATION - Connect washer/disinfector ventilation to build-
ing ventilation, as required.
7.
Open building supply valves and check for leaks: correct if
necessary.
8.
ELECTRIC - Connect building electrical supply to washer/
disinfector. Verify tight electrical connections.
Figure 3-2. Front (Soiled) Side
Control Panel
Figure 3-3. Back (Clean) Side Control Panel