2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004
WWW.STEPPIR.COM
TEL: (425)-453-1910 FAX: (425)-462-4415
NOTES:
The reflector EHU and Director 3 EHU should be installed as shown in section XX of this manual with one exception -
when the optional 80m dipole is purchased, the truss attachment plate needs to be installed on each side of the
boom as shown in figure XX.
When installing the truss attachment plate, use the longer bolts included in the 80m dipole kit in place of the stan-
dard bolts included with the DB42 hardware as shown in figure XX. The standard length bolts will not be used,
remove them from the assembly process.
Mount the tensioning eye-bolt to the truss attachement assembly as shown in figure XX. Secure it loosely, using only
2 or 3 threads. These will be tightened later.
!""
#
$
%
&'
"
(% )*+
Tensioning Eye-Bolt Detail