Tech Support:
www.steppir.com/support
Tel: 425.891.6134
Page 5
DB36 TABLE OF CONTENTS (page 3 of 4)
Page(s)
CHAPTER TEN
62—65
SECTION 10.0
Prepare the telescoping poles for the loop and non-loop elements
62—63
SECTION 10.1
Attach the sweep couplers to the sweep tubes, mount the fiberglass spreaders
64—65
SECTION 10.2
Attach the telescoping fiberglass poles to the sweeps
66
CHAPTER ELEVEN
67—69
SECTION 11.0
Prepare the CPVC inner guide tube and diverter cone
67
SECTION 11.1
Secure the element support tube (EST) to the EHU
68—69
CHAPTER TWELVE
70—73
SECTION 12.0
Installing the truss support mast
70
SECTION 12.1
Attach the truss couplers
71
SECTION 12.2
Routing the Dacron truss cord
72—73
CHAPTER THIRTEEN
74—75
SECTION 13.0
OPTIONAL 6m passive element kit
74—75
CHAPTER FOURTEEN
76—78
SECTION 14.0
Secure the cables onto the boom
76
SECTION 14.1
Mount the DB36 onto the tower mast
77—78
CHAPTER FIFTEEN
79—82
SECTION 15.0
Troubleshooting the DB36 Yagi
79—80
Warranty information
81
SteppIR contact information
82