Locate:
Two boom-to-mast plates (
Figure 5
)
One 3/8 x 4” fully threaded bolt (EZeye™ bolt)
Three 3/8 x 16x Nylok nut
Two 3/8 flat washer
Four 2” U-bolts with saddles & Nylok nuts
Two 2 1/2” U-bolts with saddles & Nylok nuts
Insert the 3/8 x 16 x 4” fully threaded bolt through the EZeye™ hole in both
mast plates, add nut then tighten (
Figure 6
), be sure that all the remaining
holes are lined up with each other. Attach the mast plate to the mast (or tem-
porary mast) using the four 2” U-bolts with saddles and nuts. Tighten se-
curely (
Figure 7
). Thread another 3/8” nut onto the EZeye™ bolt and add a
3/8” flat washer. This represents the first part of the EZeye™ adjustment sys-
tem.
Lift the boom so that the eyebolt in the middle rests on top of the EZeye™
threaded bolt (
Figure 8
). This bolt can support the full weight of the antenna.
The mast plates in figures 7 - 10 have a different look than what you are actu-
ally given.
Note:
If you are doing this on the tower leave the safety rope or cable in
place until you have secured the boom in place with the U-bolts.
Place another 3/8” flat washer after the eyebolt and then another 3/8” nut.
Attach the 2-1/2” U-bolts, saddles and nuts loosely, and then use two
wrenches to “level” the elements as shown
Figure 9
. When finished, se-
curely tighten the nuts on both U-bolts and EZeye™ (
Figure 10
).
The EZeye™ adjustment system also helps prevents vertical movement of the
elements in the event of high winds!
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10
SteppIR Antennas - 4 Element
12
Содержание 4 Element Yagi
Страница 13: ...SteppIR Antennas 4 Element 13 ...
Страница 14: ...SteppIR Antennas 4 Element 14 CONNECTING THE CONTROL CABLE TO THE D25 SPLICE ...
Страница 15: ...SteppIR Antennas 4 Element 15 ...
Страница 16: ...SteppIR Antennas 4 Element 16 ...
Страница 34: ...SteppIR Antennas 4 Element 34 ...
Страница 35: ......
Страница 36: ...2112 116TH AVE NE SUITE 1 5 BELLEVUE WA 98004 WWW STEPPIR COM TEL 425 453 1910 FAX 425 462 4415 ...