4.

 

Wiring Connections for Submersible Electric Motors 

 

 

 
 

a.

 

Procedure of installation of submersible wires and cables for submersible electric motor shall 
be in accordance to related electrical code & local regulations.  

b.

 

Submersible wire or cable sizes must be appropriate to Kilowatt (kw) or Horsepower (hp) 
rating of electric motor including voltage drop. Kindly refer to electrical code & local 
regulations.  

c.

 

Procedure of submersible wire or cable termination or connection should be followed in 
accordance to electric code & local regulations. Please check IOM manual of submersible 
motor for details. 

d.

 

Electrical components related in protecting the electric motor against irregular conditions 
should be installed in control panels. 

 

SECTION VI. OPERATION PROCEDURE 

 
 
 
 

1.

 

Pre-start-up & Checking 

a.

 

Wear Personal Protective Gear or Equipment prior for start-up and operation.  

b.

 

Prepare your instrument or tools to observe the performance of the pump. 

c.

 

Check water source. Never operate the pump if water has presence of excess sand or any solid 
particles.  

d.

 

Check motor insulation using insulation tester. Never activate the motor if insulation reading 
is less than 100 mega ohms. Please check IOM manual of submersible motor for details. 

e.

 

Check power voltage. Never operate motor if voltage is not within the normal range. Please 
refer Section VII. #5.a for reference.  

e.

 

Make sure rotation of electric motor is correct prior for start-up to avoid producing strong 
vibration during operation.  

 

2.

 

Start-Up  

a.

 

Close the isolation valve in discharge pipe.  

 
 
 
 

b.

 

Start the driver.  

c.

 

Slowly open the isolation valve in discharge pipe.  

d.

 

Do not operate the pump exceeding to its rated working pressure. 

e.

 

Use calibrated tester or current meter instrument to check if actual current of motor is within 
the normal range.  

f.

 

Observe the pump & discharge pipe. If excess vibration and disturbing noise are observe, 
immediately shut down the motor and inspect the pump and main riser column pipe.  

f.

 

Adjust all necessary protective electrical components in control panel for motor protection.   

g.

 

Do not operate electric motors if actual voltage fluctuates. Please refer Section VII. #5.a for 
reference.  

 
 
 
 
 

Содержание BDS Series

Страница 1: ...Stellar Pump Australia 1 Installation Operation and Maintenance IOM Manual Installation Operation Maintenance Manual BDS Series Submersible Borehole Stainless Steel Pump...

Страница 2: ...umbers are not on the list it means The list is not yet updated quarterly updating the Authentic page It has been removed to accommodate newly registered serial numbers The product s that you have rec...

Страница 3: ...View Page 8 Section X Trouble Shooting Page 9 SECTION I INTRODUCTION STELLAR BDS Series submersible borehole stainless steel pumps are designed for extreme high in head The said series is made in sta...

Страница 4: ...before performing installation operation and maintenance of this pump SECTION III WARRANTY CONDITION This warranty applies against all defective materials and or faulty manufacture for the period of...

Страница 5: ...h necessary codes b Water tanks must be free from any constructions debris large solid particles or welding fluxes to avoid damaging the internal parts of the pump c Submersible pump may be installed...

Страница 6: ...heck water source Never operate the pump if water has presence of excess sand or any solid particles d Check motor insulation using insulation tester Never activate the motor if insulation reading is...

Страница 7: ...e within the normal range Compare the said readings with previous data d Water level in deep well or water tank should be sufficient enough while pump is operation e Check quality of water discharging...

Страница 8: ...y Item Description 5 Impeller 11 Strap Refer to Section IX for reference b Continuous operation Item Description 5 Impeller 11 Strap 7 Diffuser Chamber 8 Valve Cap 6 Bearing 4 Seal ring SECTION IX EXP...

Страница 9: ...d wires cables to reverse the rotation 5 Replace impeller but take note BHP vs motor HP 6 Remove solid particles 7 Replace wear ring Excessive noise and vibration 1 Trap air or leak at main riser colu...

Отзывы: