background image

14

ROCK.AIR.COOL

D  Inspection flap

 (rear)

Inspection flap  D

Opening:
•  To open the inspection flap, grip it at the bottom. 
•  Gently press it upwards.
•  Pull towards your body.
•  Pull down and remove.
•  Disconnect the power, the water and the supply line.

Closing:
•  Insert the top section of the inspection flap in the 

toothed rail (see photo).

•  Slide it up and press it against the cube.

Removing the cooler:

•  Remove the worktop  B  using a glass suction 

device.

•  Undo the round-head screws in the front profile rail.
•  Remove the profile rail.
•  Remove the countersunk screws from the front cross-

strut.

•  Remove the cross-strut.

B  Worktop

A  Cover 

     To open, lift up and slide back.

Available items • sm-ro-air-cool-fp ...

• sm-ro-air-cool-sz ...
• sm-ro-air-freeze-szi ...

C  Refrigerator drawer

   To open, pull out at left or right side.

Содержание ROCK.AIR

Страница 1: ...1 ROCK AIR OUTDOOR KITCHEN USER MANUAL Showrooms Sankt Martin Linz Vienna A Hamburg D London GB St Gallen CH KITCHEN INTERIOR DESIGN ARCHITECTURE www steiningerdesigners com ...

Страница 2: ...SAFETY INSTRUCTIONS p 3 INSTALLATION INSTRUCTIONS p 4 PLANNING INSTRUCTIONS p 6 ROCK AIR FIRE p 7 ROCK AIR WASH p 10 ROCK AIR COOL p 14 ROCK AIR COOK p 18 CLEANING AND CARE p 24 WINTERIZATION DEWINTERIZATION p 25 ...

Страница 3: ...s supply must be carried out by an expert and approved by an expert with the requisite authorisation In propane gas systems only gas regulators marked 50 mbar are permitted for installation in the supply line between the gas canisters and the unit itself The use of regulators with adjustable operating pressure or high pressure regulators is strictly prohibited Propane gas systems must be secured w...

Страница 4: ...4 INSTALLATION INSTRUCTIONS ...

Страница 5: ...wash 200 Kg 1 2 1 2 50mm Rock Air Wash FP sm ro air wash fp 240 VAC 16A 250 Kg 3 4 38mm 19mm Rock Air Cool FP sm ro air cool fp 240 VAC 16A 200 Kg Rock Air Cool SZ sm ro air cool sz 240 VAC 16A 240 Kg Rock Air Freeze SZ sm ro air freeze szi 240 VAC 16A 250 Kg 3 8 Gas connection acc To DIN EN 3383 GAS WATER 1 2 DIN EN 3383 1 2 DIN EN 3383 1 2 DIN EN 3383 1 2 DIN EN 3383 Water supply Ø Water drain Ø...

Страница 6: ... When setting up the individual cubes make sure that the load points are positioned on a solid base The tools supplied with the unit can be used to adjust the height of the feet and level the cubes Level the bodies carefully ...

Страница 7: ...an 30 seconds or if the maximum flame height is reached an acoustic signal is emitted Model Item Gas Pressure Connection Gas consumption ROCK AIR Fire Gas Tall sm ro air fire gt Natural gas 20 n s ROCK AIR Fire Gas Tall sm ro air fire gt Liquid gas 50 3 5 kg h ROCK AIR Fire Gas Small sm ro air fire gs Natural gas 20 1 42 m h ROCK AIR Fire Gas Small sm ro air fire gs Liquid gas 50 1 17 kg h FLAMES ...

Страница 8: ...ceiver D for the remote control must be kept clear C B D Warnings Never leave the open fire burning unattended Never throw flammable materials cigarette stubs wood etc or other waste into the fire Never allow the burner s electrical system to come into contact with water It is prohibited to re ignite the burner immediately after it has been turned off Please wait approx 10 minutes to ensure that a...

Страница 9: ... gel in the metal tray provided so that the bottom is covered Steininger recommends BLOMUS Burning Gel 1000 ml Fill in the desired amount depending on the desired burning time 1000 ml are enough for about 40 minutes The flame must not be covered or extinguished The fire must extinguish without intervention Refilling is only allowed in a cooled down state POWER CONNECTION A 230 VAC 16A socket must ...

Страница 10: ...g the drain Re insert the cover starting with the edge closest to your body Sieve cover C Drain Pull up open Press in closed A Cover To open lift up and slide back E Siphon rear D Drawer To open pull out at left or right side Gas canister and replacement utensils in drawer Available items sm ro air wash sm ro air wash fp C Drain cover and below sieve cover B Extendible tap F Inspection flap rear C...

Страница 11: ...e and supply line must be kept free of water during winter If necessary use compressed air to drain the supply line thoroughly Installation Screw the drained siphon back on tightly Close the inspection flap ROCK AIR WASH Inspection flap F Opening To open the inspection flap grip it at the bottom Gently press it upwards Pull towards your body Pull down and remove Closing Insert the top section of t...

Страница 12: ...a little Hold the front plate in place Pay attention to the cables Disconnect the cables The front plate must be held in place while the cables are being detached Carefully detach the green and green yellow cables on the side of the drawer Removing the dishwasher Grip the dishwasher on the left and right hand sides Apply a little pressure to detach it from the front magnet Available items sm ro ai...

Страница 13: ...ear of the unit and disconnect the power supply and the water sup ply and drain lines Pull the dishwasher out carefully In case of frost make sure that all parts that carry water are drained Removing the dishwasher Blue cable Pull the clip on the white plug forwards then pull the plug upwards to unplug it Remove the front plate Undo the fixing screws on the underside of the unit on both sides ...

Страница 14: ...flap in the toothed rail see photo Slide it up and press it against the cube Removing the cooler Remove the worktop B using a glass suction device Undo the round head screws in the front profile rail Remove the profile rail Remove the countersunk screws from the front cross strut Remove the cross strut B Worktop A Cover To open lift up and slide back Available items sm ro air cool fp sm ro air coo...

Страница 15: ...the rail towards your body Remove one screw on each side from the inside of the unit Grip the cooler in both hands and apply a little pres sure to detach it from the drawer magnet Removing the drawer Remove the screws on both sides see photo Do not drop the screws into the rail Pull the drawer to the front and away ...

Страница 16: ... ideally with 2 people Installing the cooler When installing the cooler open the inspection flap and carefully pull on the hoses to prevent them from becoming kinked When installing the frame make sure that the pins for the side frame panel are in the correct holes Once you have done this insert and tighten the screws Caution The screws have several different lengths Carefully pull the unit out an...

Страница 17: ...ted up to temperatures of 200 C Gas knob C Off Gas knob C Max flame Gas knob C Min flame A Cover To open lift up and slide back B Grill surface C Gas knob D Drawer To open pull out at left or right side E Gas canister in the drawer Available items sm ro air cook gas sm ro air cook el sm ro air cook opt ...

Страница 18: ... bottom grease tray with water Open the main gas valve and the gas canister E Set the knob to HIGH and press it At the same time press the electric ignition Propane 50mbar Natural gas LL 20mbar Natural gas H E 20mbar Propane 28 30 37 mbar 29 mbar 1 2 kg h 1 88 m 1 60 m 1 20 kg h 1 2 1 2 ...

Страница 19: ...n to the left If you do not hear a clicking sound when the ignition is pressed the battery needs replacing Remove the battery and insert a new AA battery Inserting removing the drip grille Insert the drip grille at an angle from above Then press down and forwards Cleaning care and maintenance ...

Страница 20: ...ar burner First insert the tubular burner at the side furthest from your body and press it into place Insert the tubular burner on the side closest to your body until it latches into place Removing the tubular burner Close the gas valve Ensure that the unit is cooled down then Grip the tubular burner with both hands and swivel it away from your body ...

Страница 21: ...cm Accessories in conjunction with FLAME SHIELD or FLAME SHIELD LAVA ROCK AIR COOK Accessories LAVA STONES 3 KG FOR FLAME SHIELD LAVA Item sm ro air acc lav FLAME SHIELD 1 2 FOR COOKING GRATE Item sm ro air acc shield FLAME SHIELD LAVA 1 2 FOR COOKING GRATE Item sm ro air acc shield lav 1 ...

Страница 22: ...n to ensure a clearance of 10 cm from the tray Do not close the hood completely ROCK AIR COOK TUB SIZE 1 2 Item sm ro air acc tub1 2 RGS 39 x 43 x 8 cm over 2 burners for stewing and steaming in plenty of liquid not suitable for roasting in fat TEPPANYAKI COOKING PLATE 1 2 SANDWICH Item sm ro air acc tep sa RGS 39 4 x 43 4 cm over 2 burners with drainage 25 mm sandwich base Special stainless alumi...

Страница 23: ...cm AND COVER 75 x 103 x 109 cm Item sm ro air acc hu103 Material Fabric medium grey STEININGER logo fits all elements 72 5 x 103 x 109 cm ROCK AIR COOK TEPPANYAKI COOKING PLATE 1 2 STAINLESS Item sm ro air acc tep st RGS 39 4 x 43 4 cm over 2 burners with drainage height to corner 25 mm stainless base TEPPANYAKI fat drain Accessories ...

Страница 24: ...r in the cleaning water or ten percent citric acid Do not clean using steel wool scouring pads scouring agents or agents containing chlorine iodine or bromine Powder coated surfaces Use only pure water if necessary with the addition of a small amount of neutral detergent pH7 and then soft non abrasive cloths or industrial cotton wool Use lint free cloths Moderate mechanical assistance in the form ...

Страница 25: ...er 1 empty rinse cycle so that the food grade antifreeze is completely drained ROCK AIR FREEZE Winterizing Turn off shut off the water supply line to the Rock Air module and drain the lines Disconnect the appliance from the mains close the non return valve of the water inlet fig 1 and press it in with your finger this depressurises the line and the residual water is discharged Open the ice cube dr...

Отзывы: