14
ROCK.AIR.COOL
D Inspection flap
(rear)
Inspection flap D
Opening:
• To open the inspection flap, grip it at the bottom.
• Gently press it upwards.
• Pull towards your body.
• Pull down and remove.
• Disconnect the power, the water and the supply line.
Closing:
• Insert the top section of the inspection flap in the
toothed rail (see photo).
• Slide it up and press it against the cube.
Removing the cooler:
• Remove the worktop B using a glass suction
device.
• Undo the round-head screws in the front profile rail.
• Remove the profile rail.
• Remove the countersunk screws from the front cross-
strut.
• Remove the cross-strut.
B Worktop
A Cover
To open, lift up and slide back.
Available items • sm-ro-air-cool-fp ...
• sm-ro-air-cool-sz ...
• sm-ro-air-freeze-szi ...
C Refrigerator drawer
To open, pull out at left or right side.
Содержание ROCK.AIR
Страница 4: ...4 INSTALLATION INSTRUCTIONS ...