2
COMPONENT LIST
Before commencing installation, please ensure you have the following components in your
package and materials required to complete installation.
PACKAGE CONTENTS
MATERIALS REQUIRED
(NOT SUPPLIED)
Qty.
Tick
Tick
Contents
Contents
1)
Glass door with two cut outs
x 1
2)
Glass hinge return panel with two
cut outs
x 1
3)
Glass fixed return panel
x 1
4)
Glass top support panel
x 1
5)
Top support clips
x 3
6)
Wall channels
x 2
7)
Return panel floor channel
x 1
8)
Hinge panel floor channel
x 1
9)
Hinges with allen key
x 1
10)
Stainless steel handle set
x 1
11)
Aluminium water bar
x 1
12)
No.1 square drive bit
x 1
12)
4mm drill bit
x 1
13)
40mm stainless steel screws
x 8
14)
Silicone tube
x 1
15)
10mm PVC door seal
x 1
16)
10mm PVC under door seal
x 1
17)
Packing blocks
x 1
18)
Channel end caps
x 2
Pencil
Drill
Diamond drill bit (only required
if drilling into tiles).
Spirit level
Silicone gun
Water spray bottle
Utility knife
No.1 square head screwdriver
checked
checked
checked
checked
checked
PREPARATION CHECKLIST
THE FOLLOWING ITEMS MUST BE COMPLETED PRIOR TO INSTALLATION
Solid fixing must be provided in the walls behind the wall channels. Refer to the
‘Layout Plan’ on page 3 to establish your shower type.
To ensure a successful result, the walls must be plumb and the floor flat and level. Any
variations must be allowed for in the plan layout.
Wall and floor surfaces must be waterproofed by a Certified Applicator and a Producer
Statement provided for the local council.
All tiling must be completed and allowed to cure before installing the shower enclosure.
Contract a plumber to ensure waste fitting is correctly installed.