®
Side By Side Ganging
1.
Open door and remove false floor(s) by
pulling up on factory installed tape tail.
2.
Align and level cabinets by adjusting
leveling glides. (Recommend using clamps)
3.
Using an electric driver install the (4)
#10 x 1/2” self drilling Phillips pan
service holes on the side panels. Two
service holes are located near the top
and two near the bottom on each side
as shown in figure.
4.
Insert the (4)cover plug caps on the
top two service holes on each cabinet.
The bottom service holes will be hidden
by the false floor.
5.
Remove tape tail and replace false
floor(s)
Back To Back Ganging
1.
Open door and remove false floor(s) by
pulling up on factory installed tape tail.
2.
Align and level cabinets by adjusting
leveling glides.
3.
Drill 5/16” holes through back panel
approximately 2” from top and 1/2”
from inside edges.
4.
Insert 1/4” machine screw through
5/16” holes and tighten using the
provided washer and nut.
5.
Remove tape tail and replace false
floor(s).
4
4
4
Ganging Hardware Kit
ITEM
QTY
#10 x 1/2" Self-Drilling Screw
1/4-20 x 3/8" Pan Head Screw
1/4-20 Nut
tape tail
1
ALL SINGLE WIDE
LOCKERS NEED TO
BE EITHER GANGED
OR MOUNTED.
Y565852 rev E
DO NOT:
You MUST:
WARNING
TIP OVER
HAZARD
Install this unit against a wall or gang
to a similar unit.
FOLLOW THESE INSTRUCTIONS TO
PREVENT UNIT FROM TIPPING OVER AND
CAUSING INJURY.
See Assembly Directions for further
instruction, available from Steelcase
dealer or call 1-888-783-3522
Pull down on doors (if equipped)
Move unit or adjust glides if loaded
Page 16 of 57
P/N 939504734
Doc # 70305 Rev J