
21
B
A
Fig. 18
Fig. 19
CONNECTING SWITCH CORD TO
MOTOR CORD
1. Place the switch cord (A) through hole (B) in front of
Cabinet.
SEE FIG. 18
2. Open motor cover, insert three prong switch cord (C)
into three hole outlet (D) of the motor cord.
SEE FIG. 19
3. Pull slack in switch cord into the cabinet. Make sure
that the power cord inside of the cabinet is properly
routed and clear of the saw blade and any pinch points
for all blade height and blade angle settings.
INSTALLATION AND LEVELING
Final location for the saw must be level, dry, well lighted,
and have enough room to allow movement around the
msaw with long pieces of wood stock.
Level the saw front to back and side to side, using a
carpenter’s level placed on the table. Use shims under
the corners, if necessary, but make sure the saw is
stable before being placed into service.
MAKE CERTAIN THAT THE SAW IS DISCONNECT-
ED FROM THE POWER SOURCE.
WARNING
!
Содержание 35990C
Страница 7: ......
Страница 18: ......
Страница 35: ...35 N NOTES N...
Страница 37: ...37 OR91712 SWITCH ASSY SC10160 MITER GAUGE ASSY 35990G 35990C 35990CS 35990CG 35990SS...
Страница 45: ...45 Switch Assembly OR91712 Miter Guage Assembly SC10160 35990CS EARLY MODEL EARLY MODEL EARLY MODEL EARLY MODEL...
Страница 47: ...39...
Страница 52: ...NOTES 52...
Страница 53: ...53...
Страница 54: ......
Страница 55: ...40...
Страница 56: ......