background image

Direct Accumulator Charging Kit

STA-CK-SKK

INSTRUCTION MANUAL

Содержание STA-CK-SKK

Страница 1: ...Direct Accumulator Charging Kit STA CK SKK INSTRUCTION MANUAL...

Страница 2: ...coupling the safety gauge directly to the SKK gas valve connection on the STAUFF accumulator Features The standard kit is delivered in a storage case containing the following 1 1 x Charging valve 2 1...

Страница 3: ...umulators In cases where the gauge and gauge adaptor will be left on the accumulator make sure that the gauge fitted is rated for the maximum system pressure of the hydraulic circuit 7 Never use an ac...

Страница 4: ...ength 2000 mm Test Coupling 1 4 BSPP Connection 4 STAUFF SKK Gas Valve Coupling SKK Test Coupling 1 4 NPT for regulator connection Ensure appropriate thread sealing compound is applied prior to connec...

Страница 5: ...nnection flow chart Remove the protection cap on the SKK gas valve coupling F fitted to the gas side of the accumulator Select the safety pattern pressure gauge and adaptor 3 and couple directly to th...

Страница 6: ...on the nitrogen gas source until a small amount of gas can be heard coming from the bleed valve D which should be open After 5 seconds 0 7 Ltr 4 Ltr and 10 to 20 seconds 10 Ltr 55 Ltr slowly close th...

Страница 7: ...upling 2 fitted to the regulator Slightly open the valve on the nitrogen gas source until a small amount of gas can be heard coming from the bleed valve D which should be open After 5 seconds 0 7 Ltr...

Страница 8: ...l 39 0362 63 80 70 sales stauff it THAILAND STAUFF Thailand Co Ltd Tel 66 2 712 25 98 sales stauff co th CHINA STAUFF China Tel 86 21 68 18 70 00 info stauff com cn KOREA STAUFF Korea Ltd Tel 82 51 26...

Отзывы: