background image

2

www.stauff.com

STA-CK-SKK

Operating Instructions available online

 

Only use “gas approved" test hose

 

For use with nitrogen (N

2

) gas only

 

Safety goggles must be worn at all times

 

STAUFF pressure gauges are safety pattern type according to AS1349

6

1

4

3

5

2

Description

STAUFF's accumulator direct charging kit - SKK is an essential  instrument for the verification, pressurisation and nitrogen gas bleeding of 
STAUFF accumulators fitted with a SKK gas valve connection. Pre-charge pressure can be easily checked by coupling the safety gauge directly 

to the SKK gas valve connection on the STAUFF accumulator.

Features

The standard kit is delivered in a storage case containing the following:

1

  1 x Charging valve

2

   

1 x SKK Test coupling 1/4" NPT (for regulator connection)

3

   1 x Safety pattern pressure gauge according to AS1349-1986

4

  1 x 2 Metre hose

5

   1 x Safety goggles

 1 x Operating instructions

Available pressure gauges

 0 - 25, 0 - 100, 0 - 250 & 0 - 400 bar kit

Application

  For checking and pre-charging of accumulators with 

M16 x 2.0 (Test 20) or M16 x 1.5 (Test 15) or M12 x 1.65 (Test 12) STAUFF Test coupling connection (optional)

 Maximum working pressure of this equipment (excluding individual pressure rating of gauges) is 400 bar.

Содержание STA-CK-SKK

Страница 1: ...Direct Accumulator Charging Kit STA CK SKK INSTRUCTION MANUAL...

Страница 2: ...coupling the safety gauge directly to the SKK gas valve connection on the STAUFF accumulator Features The standard kit is delivered in a storage case containing the following 1 1 x Charging valve 2 1...

Страница 3: ...umulators In cases where the gauge and gauge adaptor will be left on the accumulator make sure that the gauge fitted is rated for the maximum system pressure of the hydraulic circuit 7 Never use an ac...

Страница 4: ...ength 2000 mm Test Coupling 1 4 BSPP Connection 4 STAUFF SKK Gas Valve Coupling SKK Test Coupling 1 4 NPT for regulator connection Ensure appropriate thread sealing compound is applied prior to connec...

Страница 5: ...nnection flow chart Remove the protection cap on the SKK gas valve coupling F fitted to the gas side of the accumulator Select the safety pattern pressure gauge and adaptor 3 and couple directly to th...

Страница 6: ...on the nitrogen gas source until a small amount of gas can be heard coming from the bleed valve D which should be open After 5 seconds 0 7 Ltr 4 Ltr and 10 to 20 seconds 10 Ltr 55 Ltr slowly close th...

Страница 7: ...upling 2 fitted to the regulator Slightly open the valve on the nitrogen gas source until a small amount of gas can be heard coming from the bleed valve D which should be open After 5 seconds 0 7 Ltr...

Страница 8: ...l 39 0362 63 80 70 sales stauff it THAILAND STAUFF Thailand Co Ltd Tel 66 2 712 25 98 sales stauff co th CHINA STAUFF China Tel 86 21 68 18 70 00 info stauff com cn KOREA STAUFF Korea Ltd Tel 82 51 26...