background image

9

TYPICAL WIRE DIAGRAM

TPG, 270 - 2,500 KBTUH
TPO, 800 - 2,500 KBTUH
TPD, 400 - 2,500 KBTUH

TYPICAL WIRE DIAGRAM

TPG, 140 - 255 KBTUH

Содержание TPD-140-140

Страница 1: ...USING APPLIANCE ASME WARNING PROPANE MODEL Water heaters for propane gas are different from natural gas models A natural gas heater will not function safely on propane gas and no attempt should be ma...

Страница 2: ...an Gas Association Laboratories 55 Scarsdale Road Don Mills Ontario Canada M3B 2R3 TABLE OF CONTENTS This manual is supplemented by the power burner manual All information including start up and maint...

Страница 3: ...THE FLOW OF COMBUSTION AND VENTILATING AIR ADEQUATE AIR FOR COMBUSTION AND VENTILATION MUST BE PROVIDED FOR SAFE OPERATION LIQUID PETROLEUM MODELS Water heaters for propane or liquefied petroleum gas...

Страница 4: ...American Insurance Association 85 John Street New York NY 11038 Note Some gas utility companies derate the heating value of the supplied gas at high elevations Your authorized State Start Up Agent mus...

Страница 5: ...18 Inches FRONT 18 Inches BACK 0 Inches Back 6 Inches TOP 5 Inches Top 12 Inches LEFT SIDE 0 Inches LEFT SIDE 6 Inches RIGHT SIDE 0 Inches RIGHT SIDE 6 Inches NOTE If a chimney connector is used the m...

Страница 6: ...STION OR RECIRCULATION OF FLUE GASES SUCH CONDITIONS CAUSE SOOTING OR RISKS OF FIRE AND ASPHYXIATION Heater must be protected from freezing downdrafts during shutdown periods Remove all soot or other...

Страница 7: ...OCATED IN FREEZING AREAS DO NOT THREAD OR CAP THE END OF THIS LINE RESTRICTED OR BLOCKED DISCHARGE WILL DEFEAT THE PURPOSE OF THE VALVE AND IS UNSAFE DISCHARGE LINE SHALL BE INSTALLED TO ALLOW COMPLET...

Страница 8: ...UAL GAS SHUTOFF VALVE BEFORE PLACING THE HEATER IN OPERATION CHECK FOR GAS LEAKAGE USE SOAP AND WATER SOLUTION OR OTHER MATERIAL ACCEPTABLE FOR THE PURPOSE OF LOCATING GAS LEAKS DO NOT USE MATCHES CAN...

Страница 9: ...9 TYPICAL WIRE DIAGRAM TPG 270 2 500 KBTUH TPO 800 2 500 KBTUH TPD 400 2 500 KBTUH TYPICAL WIRE DIAGRAM TPG 140 255 KBTUH...

Страница 10: ...10 TYPICAL WIRE DIAGRAM TPO 140 720 KBTUH TYPICAL WIRE DIAGRAM TPD 140 300 KBTUH...

Страница 11: ...ired should be performed by an Authorized State Service Agent GENERAL NEVER OPERATE THE HEATER WITHOUT FIRST BEING CERTAIN IT IS FILLED WITH WATER AND A TEMPERATURE AND PRESSURE RELIEF VALVE IS INSTAL...

Страница 12: ...Inspect Quarterly non detergent motor oil Power Burner Combustion and Ignition Inspection Semi Annually test kit Device 2 test specifications Main Burner Check Flame Annually Flue Baffle Pipe 3 Cleani...

Страница 13: ...ary 9 Replace outer jacket cover plate RELIEF VALVE At least twice a year the temperature and pressure relief valve should be checked to ensure that it is in operating condition To check the relief va...

Страница 14: ...n incoming water temperature was warm colder water creates the effect of less hot water 5 Look for hot water wastage and leaking or open hot water faucets 6 Sediment or lime scale may be affecting wat...

Страница 15: ...ist of Installation of a second relief valve with lower setting than the primary relief valve An expansion tank of suitable size and pressure rating and provision to avoid water logging REPLACEMENT PA...

Страница 16: ...evice acting as a backflow prevention device check valves etc is installed in the cold water supply the heater is connected to unless an effective method of controlling thermal expansion is also insta...

Отзывы: