![State Water Heaters Sandblaster SBD30 150 NE Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/state-water-heaters/sandblaster-sbd30-150-ne/sandblaster-sbd30-150-ne_service-handbook_1367029007.webp)
SBN71-120 thru 85-390, SBD30-150/199 TANK TYPE COMMERCIAL
GAS WATER HEATER SERVICE HANDBOOK
t
n
e
m
tr
a
p
e
D
g
n
i
n
i
a
r
T
l
a
c
i
n
h
c
e
T
6
s
r
e
t
a
e
H
r
e
t
a
W
e
t
a
t
S
7
0
0
2
©
e
e
s
s
e
n
n
e
T
,
y
ti
C
d
n
a
l
h
s
A
REQUIRED EXTERIOR CLEARANCES
The illustration below shows the required clearances for venting units using natural draft
venting.
The vent must extend at least 3 feet above the highest point where it passes through a roof of
a building and at least 2 feet higher than any portion of a building within a horizontal distance
of 10 feet (for vents of 12 inches in diameter or less).
References: NFPA 54 2006; ANSI Z 223.1 SEC 12.6.2 and Sec12.7.2 may allow reduction to
8 feet with a “listed vent cap.”
“
Copyright by the American Gas Association. Used by permission of the copyright holder”
.