Reboke 6000 TSI Instruction Manual
32
7.13 - Hydraulic system installation
The hydraulic system installation begins with the electro-hydraulic controls, which are mounted over
the hitch assembly. Next, mount the remaining components (hoses, connections, etc.).
7.14 - Installing the treatment system
Install the treatment system starting with the
pumps, next to the pumps and to the control
center, then on to the spray nozzles and returning
back to the pumps.
Hook-up the electrical system to the electronics
control panel, hooking-up the pumps, solenoids,
agitator motors, the graphite mixer, and the work
lights.
7.15 - Independent hydraulic system
installation
The independent hydraulic system is an optional
package, and its mounting is done on the front
side of the chassis, above the hitch.
Figure 46
CONTROL
PANEL
PUMPS
Figure 47
Содержание Reboke 6000 TSI
Страница 1: ...MANU 1072 HIN Rev E REBOKE 6000 TSI Farming Wagon Instruction Manual...
Страница 2: ......
Страница 4: ......
Страница 7: ...TECHNICAL DELIVERY TERMS 57 TECHNICAL CHECK UP TERMS 61...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 16: ...Reboke 6000 TSI Instruction Manual 14 4 DIMENSIONS Figure 3 2 7 m 5 m 4 3 m 3 7 m 3 3 m 3 4 m 5 2 m Figure 4...
Страница 46: ......
Страница 54: ......
Страница 56: ......
Страница 58: ......
Страница 64: ......
Страница 66: ......
Страница 68: ......