![Star Solar TKF-26GW Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/star-solar/tkf-26gw/tkf-26gw_installation-and-operation-instruction-manual_1362949038.webp)
Tel:(86) 574 26266608
Fax:(86)574 26266618
Email:
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Ningbo Star Solar Co.,Ltd Tel:(86) 574 26266608
Fax:(86) 574 26266618 56664636 Email:[email protected]
Http://www.pvsolarchina.com
S
S
S
Solar
olar
olar
olar A
A
A
Air
ir
ir
ir Conditioner
Conditioner
Conditioner
Conditioner IIIInstallation
nstallation
nstallation
nstallation
T
T
T
The
he
he
he length
length
length
length of
of
of
of piping
piping
piping
piping and
and
and
and ffffreon
reon
reon
reon
①
When the pipe line is extended, discharge the air in the connecting pipe with
refrigerant gas, which is from the outside of
the system. And then, discharge the
redundant refrigerant in degassing method.
②
Installation height of the indoor unit and the outdoor unit
should be below 5 m.
③
The length of the pipe, which connects the indoor unit and the
outdoor unit, should be less than 8m and TKF(R)-72GW shall be
less than 10m.
④
The refrigerant filling amount of the solar air conditioner
should be adjusted according to the length of the pipe (L). The
refrigerant increment G= (L- length of the standard pipe)*N (g/m).
After Freon added, please check the inhaling maximum working
pressure with the parameters.
Connection
Connection
Connection
Connection of
of
of
of the
the
the
the Power
Power
Power
Power Supply
Supply
Supply
Supply of
of
of
of the
the
the
the Outdoor
Outdoor
Outdoor
Outdoor Units
Units
Units
Units
Dismount the outlet box of the outdoor unit; connect the triple
core wire and the twin core wire with the five jacks of the
connecting terminals in accordance with their colors. As
shown in the following form, the connection method of the
triple core wire of the subsidiary electric heating pipe on the
insulating barrel is that the blue wire is connected with
terminal board 4 (N), the red wire is connected with terminal
board 3; the yellow/green wires are connected with terminal
board grounded.
-
The Terminal Board Base on the
Outdoor Units
1
2
3
4(N)
The Color of Wire Connected With
the Indoor Unit
Brown
Yellow
Red
Blue
Yellow/Green
Connecting
with
the
Auxiliary
Electric Heating Tank
Red
Blue
Yellow/Green
Model
N
TKF(R)-26GW
35g
TKF(R)-32GW
45g
TKF(R)-35GW
50g
TKF(R)-60GW
70g
TKF(R)-72GW
100g