![Star Solar TKF-26GW Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/star-solar/tkf-26gw/tkf-26gw_installation-and-operation-instruction-manual_1362949029.webp)
Tel:(86) 574 26266608
Fax:(86)574 26266618
Email:
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Ningbo Star Solar Co.,Ltd Tel:(86) 574 26266608
Fax:(86) 574 26266618 56664636 Email:[email protected]
Http://www.pvsolarchina.com
*
Design and manufacture of erecting frame should make full consideration of
bearing intension of material and structure, corrosion resistance, and convenience for
installation and maintenance. The intension of outdoor
erecting frame should be able to endure the weight
above180kg. Steel components must be joined firmly,
accept
anticorrosive
treatment,
and
satisfy
the
standards of the
GB17790-1999 National Standard
Room Air Conditioners Installation Criterions
*
The foot screw of outdoor unit should be fixed
by the M8 or M10 bolt.
①
Outdoor unit should be installed on a solid
foundation.
②
If the outdoor unit quivers on the concrete
foundation, please lay an aseismatic rubber cushion.
③
The unit should install vertically and horizontally, the gradient is below 5°.
④
Outdoor unit installation should avoid places which some water drops spatter upon
directly, and which is near thermal spring with sulphur and nitrogen gas.
⑤
Indoor unit installation should ensure the space distance shown on the right picture.
Installation
Installation
Installation
Installation of
of
of
of the
the
the
the Solar
Solar
Solar
Solar Air
Air
Air
Air Conditioner
Conditioner
Conditioner
Conditioner
2.
2.
2.
2. Indoor
Indoor
Indoor
Indoor U
U
U
Unit
nit
nit
nit Install
Install
Install
Installation
ation
ation
ation
1) As shown in the following picture, pipelines are
connected in five directions with the indoor unit.
When the pipelines are connected in
③
or
④
direction, please adopt the saw to open a
preformed groove on the panel. When the
pipelines are connected in
⑤
direction, please
adopt the saw to open a preformed groove under
the panel.
2) Adopt five 5Y51 size wooden bolts to fix the board on the wall
Notice:
*
If indoor unit is installed on the concrete wall,
please adopt bulgy bolt.
*
When you install the board, you are supposed to
use weight dropper to test the board whether it is
horizontal or vertical.
*
The installed board should be able to bear 50 kg.
*
Ensure that the board is firm and solid.
3) Based on the junction direction of the pipeline (Please consult the following picture), a
hole which is provided with the diameter of 65 mm, is drilled in the corresponding place
on the wall. Then the wall bushing and the tube cap are placed into the hole. If the
pipeline is connected in the
③
or
④
direction, the hole in the
③
or
④
should be
opened a little lower than the height of the hole in the
①
or
②
.The aim is to ensure the
condensate flowing out of the pipeline conveniently.
①
Back
③
Left
⑤
down
②
Left-back
④
Right
Weight dropper
Plumb-line
Wooden bolt
The board
Left exit
Less low
Center
Left-back exit
The board
Center
Right exit
Right-back exit
Outdoor side
Indoor side
Wall
Pipe through the wall
Pipe cover
About less 5-7 mm
White luting to seal up