
8
EN
Preparing the power cable
Remove the power cable insulation
(inside the cover, 1 cm +/- 2 mm) to
connect the Faston connectors.
Connecting the Faston connectors
Connect the Faston connectors to
the 2 pins in the left hole (no mounting
direction).
STEPS
7
8
9
Installing the left cover
Screw the cover (4 M3 screws and
washers) by adjusting the length of the
cable (inside the hole). Screw the cable
gland onto the cable.