14 ► SK58 

User Manual

ACCUMULATOR TESTING 

PROCEDURE

To check or charge the accumulator the following equipment 

is required:
31254 Charge Kit: which includes the following: (Shown in 

Figure 2 on the next page.)

• 

Accumulator Tester (Part Number 02835).

• 

Charging Assembly (P/N 15304) Includes a liquid filled 

gauge w/snub valve, hose and charge fitting.

• 

NITROGEN  bottle  with  a  800  psi/56  bar  minimum 

charge. (Not included in 31254 Charge Kit.)

1. 

Remove the valve cap assembly from the sinker drill.

2. 

Remove the protective cap and loosen the 5/8-inch hex 

locking nut on the tool charging valve 1-1/2 turns.

3.  Holding  the  chuck  end  of  Accumulator  Tester  (P/N 

02835) turn the gauge fully counterclockwise to ensure 

that the stem inside the chuck is completely retracted.

4.  Thread the tester onto the accumulator charging valve. 

Do not advance the gauge-end into the chuck-end. Turn 

as a unit. Seat the chuck on the accumulator charging 

valve and hand tighten only.

5. 

Advance the valve stem of the tester by turning the 

gauge-end  clockwise  until  a  pressure  is  read  on  the 

gauge  (charge  pressure  should  be  600-700  psi/42-48 

bar).

6.  If  pressure  is  OK  unscrew  the  gauge-end  from  the 

chuck  to  retract  the  stem,  then  unscrew  the  entire 

tester assembly from the accumulator charging valve. If 

pressure is low, charge the accumulator as described in 

the following procedure.

7. 

Tighten the 5/8-inch hex locking nut on the tool charging 

valve. Be careful not to overtighten. Install the protective 

cap and valve cap assembly.

ACCUMULATOR CHARGING

1. 

Perform  steps  1  through  4  of  the  accumulator  testing 

procedure above.

2. 

Connect  the  chuck  of  the  charging  assembly  to  the 

charging valve on the accumulator tester or, if preferred, 

remove the tester from the charging valve and connect 

the  charging  assembly  chuck  directly  to  the  charging 

valve.

3.  Adjust  the  regulator  to  the  charging  pressure  of  600 

psi/42 bar.

Note: It may be necessary to set the gauge at 650-700 

psi/45-48  bar  to  overcome  any  pressure  drop  through 

the charging system.

4.  Open the valve on the charging assembly hose.

5.  When the accumulator is fully charged close the valve on 

the charging assembly hose and remove the charging 

assembly  chuck  from  the  accumulator  tester  or  tool 

charging valve.

6. 

If the accumulator tester has been used, be sure to turn 

the  gauge-end  fully  counterclockwise  before  removing 

the tester from the charging valve of the tool.

7. 

Tighten the 5/8-inch hex locking nut on the tool charging 

valve and replace the protective cap.

8. 

Replace the valve cap assembly.

MAINTENANCE

Figure 2. Charging the Accumulator

Содержание SK58

Страница 1: ...2014 STANLEY Black Decker Inc New Britain CT 06053 U S A 70744 4 2021 Ver 14 USER MANUAL Safety Operation and Maintenance SK58 HYDRAULIC SINKER DRILL...

Страница 2: ......

Страница 3: ...warranty validation record must be submitted to validate the warranty SERIOUS INJURY OR DEATH COULD RESULT FROM THE IMPROPER REPAIR OR SERVICE OF THIS TOOL REPAIRS AND OR SERVICE TO THIS TOOL MUST ONL...

Страница 4: ...messages that follow this symbol to avoid possible injury or death This safety alert and signal word indicates an imminently hazardous situation which if not avoided will result in death or serious in...

Страница 5: ...uplers and cause overheating of the hydraulic system Do not operate the tool at oil temperatures above 140 F 60 C Operation at higher oil temperatures can cause operator discomfort and may damage the...

Страница 6: ...NOT ABUSE HOSE DO NOT USE KINKED TORN OR DAMAGED HOSE 3 MAKE SURE HYDRAULIC HOSES ARE PROPERLY CON NECTED TO THE TOOL BEFORE PRESSURING SYSTEM SYSTEM PRESSURE HOSE MUST ALWAYS BE CON NECTED TO TOOL IN...

Страница 7: ...TH TO REMOVE DIRT AND MOISTURE AND TEST HOSE FOR MAXIMUMALLOWABLE CURRENT LEAKAGE INACCORDANCE WITH SAFETY DEPARTMENT INSTRUCTIONS SEE OTHER SIDE SIDE 2 D O N O T R E M O V E T H I S T A G 3 DO NOT EX...

Страница 8: ...175 1 25 4 Return 2500 175 13 16 49 60 up to 25 up to 8 5 8 16 Pressure 2500 175 3 4 19 Return 2500 175 13 16 49 60 26 100 8 30 3 4 19 Pressure 2500 175 1 25 4 Return 2500 175 Figure 1 Typical Hose C...

Страница 9: ...operator discomfort at the tool Filter minimum full flow filtration 25 microns 25 microns 25 microns 25 microns Sized for flow of at least For cold temp startup and maximum dirt holding capacity 30 G...

Страница 10: ...e tool The air supply must be minimum 30 cfm at 120 psi Supplying less than these specifications may result in inadequate extraction of rock cuttings cause cuttings to migrate up the drill steel and i...

Страница 11: ...ERATION If the breaker is to be used during cold weather preheat the hydraulic fluid at low engine speed When using the normally recommended fluid fluid temperature should be at or above 50 F 10 C 400...

Страница 12: ...by STANLEY Supply hoses must have a minimum working pressure rating of 2500 psi 172 bar Do not exceed the rated flow Rapid failure of the internal seals may result See Specifications in this manual f...

Страница 13: ...blocked Remove restriction Orifice plug blocked Remove restriction Fluid too hot above 140 F 60 C or too cold below 60 F 16 C Check power unit for proper fluid temperature Bypass cooler to warm the f...

Страница 14: ...then unscrew the entire tester assembly from the accumulator charging valve If pressure is low charge the accumulator as described in the following procedure 7 Tighten the 5 8 inch hex locking nut on...

Страница 15: ...Dip or spray the entire tool 3 Cycle the tool hydraulically several times before storing away GENERAL SERVICE NOTES 1 If the breaker is repainted after servicing be sure to mask off the vent in the v...

Страница 16: ...XIS 16 0 M SEC UNCERTAINTY K 1 2 M SEC MEASURED VIBRATION EMISSION VALUE WITH UNCERTAINTY Z AXIS 17 2 M SEC ACCESSORIES DRILL STEELS FOR USE WITH AIR 1 in Hex 4 1 4 in H Thread 24 in 61 cm UC 05170 1...

Страница 17: ...33 31 21 30 59 60 29 27 26 25 24 23 22 21 69 76 97 77 78 98 79 96 80 81 82 91 92 93 94 95 86 90 83 89 88 83 84 85 87 54 55 53 52 51 50 34 20 35 34 36 49 48 38 40 39 41 42 5 3 45 44 43 1 47 2 3 4 5 7...

Страница 18: ...O RING 42 04777 1 THROTTLE VALVE 43 04778 1 BLOWER TUBE NUT 44 00016 1 O RING ITEM PART NO QTY DESCRIPTION 45 00175 1 O RING 46 04660 1 HOUSING 47 00772 1 KEY 48 07291 1 MODIFIED CAPSCREW 49 04512 1...

Страница 19: ...VE GEAR 101 00026 2 O RING 102 04776 1 TUBE CONNECTOR 103 04796 1 NAME TAG 104 04768 1 WATER VALVE SK58120 ONLY 105 03972 1 COUPLER FEMALE 106 03973 1 COUPLER MALE 107 30646 1 MOTOR ASSEMBLY SK58110 1...

Страница 20: ...s do not have accumulators and thus are capable of deeper depths The methods are broken into diver operated or remote operated vehicle ROV ROV s can reach lower depths and with an onboard hydraulic po...

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ...STANLEY Infrastructure 6430 SE Lake Road Portland Oregon 97222 USA 503 659 5660 Fax 503 652 1780 www stanleyinfrastructure com...

Отзывы: