background image

10 ► SK47 

User Manual

The recommended hose size is .500 inch/12 mm ID up 

to 50 ft/15 m long and .625 inch/16 mm ID minimum up 

to 100 ft/30 m.

PRE-OPERATION PROCEDURES

CHECK POWER SOURCE

1. 

Using a calibrated flow meter and pressure gauge, 

check that the hydraulic power source develops a 

flow of 7–9 GPM/26–34 LPM at 1500–2000 psi/105–

140 bar.

2. 

Make certain the hydraulic power source is equipped 

with a relief valve set to open at 2100–2250 psi/145–

155 bar maximum.

INSTALL DRILL STEEL & ROCK BIT

Use standard 4-1/4 inch shank 

×

 7/8 inch hex drill steels.

Drill  steels  are  available  in  a  variety  of  lengths.  Start 

with a short length so that the tool may be operated at a 

normal standing position. The tool handles should never 

exceed chest height during operation.

1. 

Thread a rock bit onto the drill steel.

2. 

Rotate the latch out and up.

3. 

Slide the drill steel into the tool.

4. 

Rotate the latch down being careful not to pinch your 

fingers.  When  correctly  installed,  the  collar  on  the 

drill steel should be above the bottom of the latch.

CONNECT HOSES

1. 

Wipe all hose couplers with a clean, lint-free cloth 

before making connections.

2. 

Connect the hoses from the hydraulic power source 

to the tool fittings or quick disconnects. It is a good 

practice to connect return hoses first and disconnect 

them last to minimize or avoid trapped pressure 

within the tool.

3.  Observe flow indicators stamped on hose couplers 

to ensure that fluid flow is in the proper direction. The 

female coupler on the tool hose is the inlet coupler.

4.  Move the hydraulic circuit control valve to the ON 

position to operate the tool.

Note: If uncoupled hoses are left in the sun, pressure 

increase within the hoses may make them difficult 

to  connect.  Connect  the  free  ends  of  the  hoses 

together.

5.  Connect the hose from the air supply to the hose on 

the tool.

The air supply must be minimum 30 cfm at 120 psi. 

Supplying less than these specifications may result 

in inadequate extraction of rock cuttings; cause 

cuttings to migrate up the drill steel and into the tool 

and result in tool damage; diminish drilling time; and 

cause premature wear of the drill bit.

OPERATION PROCEDURES

1.  Observe all safety precautions.
2. 

Install the appropriate tool bit for the job.

3. 

Start the hydraulic supply and turn the circuit control 

valve to the ON position.

4. 

Open the air valve on the tool just enough to permit 

a small amount of air flow from the tool bit.

Note:  Air  flow  must  be  continuous  during  drilling 

to avoid clogging of the air passages and/or back-

flushing of waste products into the drill.

5.  Place the bit firmly on the surface to be drilled. Do 

not  operate  the  sinker  drill  without  the  drill  steel 

in  contact  with  the  work  surface.  Adequate  down 

pressure is very important.

6. 

Several methods can be used to reduce the 

tendency for the drill to “walk” on the surface to be 

drilled before the hole is initiated.

If  the  trigger  is  partially  depressed,  the  piston  will 

cycle at low speed, without tool bit rotation, allowing 

a  start  hole  to  be  made. This  will  keep  the  drill  in 

place when full power is applied.
Rotating the motor control lever straight up will shut 

off  all  rotation  allowing  the  operator  to  establish  a 

starting hole prior to full application.

7.  The rotation control lever controls rotation speed 

from 0 to approximately 300 rpm. Normal drilling is 

best accomplished with the lever halfway between 

fully on and straight up off position.

Note:  Normal  drill  rotation  is  counterclockwise 

when viewed from the top of the tool. The clockwise 

rotation position of the motor control lever has been 

blocked with a roll pin stop to avoid unscrewing a 

drill bit at the bottom of the drilled hole.

8. 

Ensure the rock bit is rotating at a moderate speed 

(not too fast, not too slow). When starting the hole, 

it is best to start at a slow impact and rotation speed 

until the rock bit has carved out a depression in the 

material being drilled. If the rock bit is not rotating 

OPERATION

Содержание SK47

Страница 1: ...2014 STANLEY Black Decker Inc New Britain CT 06053 U S A 10323 2 2018 Ver 9 USER MANUAL Safety Operation and Maintenance SK47 HYDRAULIC SINKER DRILL...

Страница 2: ......

Страница 3: ...y Note The warranty validation record must be submitted to validate the warranty SERIOUS INJURY OR DEATH COULD RESULT FROM THE IMPROPER REPAIR OR SERVICE OF THIS TOOL REPAIRS AND OR SERVICE TO THIS TO...

Страница 4: ...messages that follow this symbol to avoid possible injury or death This safety alert and signal word indicates an imminently hazardous situation which if not avoided will result in death or serious in...

Страница 5: ...connecting Use only lint free cloths Failure to do so may result in damage to the quick couplers and cause overheating of the hydraulic system Do not operate the tool at oil temperatures above 140 F 6...

Страница 6: ...ESSURING SYSTEM SYSTEM PRESSURE HOSE MUST ALWAYS BE CON NECTED TO TOOL IN PORT SYSTEM RETURN HOSE MUST ALWAYS BE CONNECTED TO TOOL OUT PORT REVERSING CONNECTIONS MAY CAUSE REVERSE TOOL OPERATION WHICH...

Страница 7: ...TH TO REMOVE DIRT AND MOISTURE AND TEST HOSE FOR MAXIMUMALLOWABLE CURRENT LEAKAGE INACCORDANCE WITH SAFETY DEPARTMENT INSTRUCTIONS SEE OTHER SIDE SIDE 2 D O N O T R E M O V E T H I S T A G 3 DO NOT EX...

Страница 8: ...Pressure 2500 175 1 25 4 Return 2500 175 13 16 49 60 up to 25 up to 8 5 8 16 Pressure 2500 175 3 4 19 Return 2500 175 13 16 49 60 26 100 8 30 3 4 19 Pressure 2500 175 1 25 4 Return 2500 175 Figure 1 T...

Страница 9: ...operator discomfort at the tool Filter minimum full flow filtration 25 microns 25 microns 25 microns 25 microns Sized for flow of at least For cold temp startup and maximum dirt holding capacity 30 G...

Страница 10: ...si Supplying less than these specifications may result in inadequate extraction of rock cuttings cause cuttings to migrate up the drill steel and into the tool and result in tool damage diminish drill...

Страница 11: ...e bit is lifted from the hole 15 When the tool drill steel and bit have been removed from the drill hole turn the valve lever OFF and turn the hydraulic supply circuit control valve OFF before changin...

Страница 12: ...LEY Supply hoses must have a minimum working pressure rating of 2500 psi 172 bar Do not exceed the rated flow and pressure See Specifications in this manual for correct flow rate and pressure rating R...

Страница 13: ...ract the stem then unscrew the entire tester assembly from the accumulator charging valve If pressure is low charge the accumulator as described in the following paragraph 7 Tighten the 5 8 inch hex l...

Страница 14: ...14 SK47 User Manual Figure 2 Charging the Accumulator CHARGING THE ACCUMULATOR...

Страница 15: ...blocked Remove restriction Orifice plug blocked Remove restriction Fluid too hot above 140 F 60 C or too cold below 60 F 16 C Check power unit for proper fluid temperature Bypass cooler to warm the fl...

Страница 16: ...ith Air 7 8 in 22 mm Hex 4 1 4 in 108 mm H Thread 24 in 61 cm UC 05174 Carbide Rock Bits for use with Air 1 3 8 in 34 9 mm Diameter H Thread 05177 1 1 2 in 38 1 mm Diameter H Thread 05178 2 in 50 8 mm...

Страница 17: ...SK47 User Manual 17 SK47 PARTS ILLUSTRATION 83 Motor Assy...

Страница 18: ...VALVE 32 08097 1 VALVE SPOOL 33 08098 1 SPRING 34 08104 1 O RING PLUG 35 04934 1 CUP SEAL 36 04780 1 WASHER 37 04386 1 CUP SEAL 38 02022 1 O RING 39 00473 1 O RING ITEM PART NO QTY DESCRIPTION 40 0493...

Страница 19: ......

Страница 20: ...STANLEY Infrastructure 6430 SE Lake Road Portland Oregon 97222 USA 503 659 5660 Fax 503 652 1780 www stanleyinfrastructure com...

Отзывы: