background image

Istruzioni, instructions, instrucciones 

 

                                                                              

 

10

 

 

 

                                                                                                            

Dimensions and height 

 

Before starting 
installation process, 
please check the gear 
motor placement area 
in relation to its heights 
and dimensions (fig.1).  
 

 
 
 
 
 
 
                                      
Fig.1  

    

 

Fixing of the

 

foundation plate

  

Unscrew four lateral screws in order to remove the cover 
of Achilles 4000 (fig.2). 
Before fixing Achilles 4000 body, prearrange one or more 
sheathing

 

to allow shifting of cables.

 

After  having  checked  optimal  conditions

 

for  the  body 

placement position on the six clamps and insert it in the 
concrete

 

(fig.3). 

    

Fig.

2      

        

 
 

 

 

 

 

 

 

 

 

 

 

                                                                                                                             

          

 

 
 
 
 
 
 
 
 

5

7

0

6

0

5

327

392

1

1

1

400

Содержание ACHILLES-4000

Страница 1: ...gnoli excludes any responsibility for the damage caused by the use of not original components Please ensure that the structure of the gate is reliable and adaptable to be motorized Please ensure that the gate while moving is not subjected to friction at any point and there is no possibility to derail the gate Please ensure before any action is taken at the gate that the power supply is cut off Con...

Страница 2: ...pecification of the various models Technical data ACHILLES 4000 230Vac ACHILLES 4000 400Vac Power supply 230V 50 Hz 400V 50 Hz Power absorption A 6 4 3 75 Motor supply 230V 400V three phase Engine power W 1500 W 1500 W N engine revolutions rpm 1400 1400 Reduction ratio 1 30 1 30 Min speed with full load 11 m min 11 m min Working temperatures C 20 60 20 60 Working cycle intensive 50 intensive 50 Le...

Страница 3: ...nsions fig 1 Fig 1 Fixing of the foundation plate Unscrew four lateral screws in order to remove the cover of Achilles 4000 fig 2 Before fixing Achilles 4000 body prearrange one or more sheathing to allow shifting of cables After having checked optimal conditions for the body placement position on the six clamps and insert it in the concrete fig 3 Fig 2 570 605 327 392 111 400 ...

Страница 4: ...ack and position it above the gear ensure a space of at least 1 mm between the gear itself and the rack than fix it to the gate with screws Control the correct positioning by sliding door manually fig 5 Fig 4 Fig 5 Continue fixing process of the remaining rack with respect of the gap between one joint and another fig 6 Position limit brackets on the rack and adjust position of the brackets by slid...

Страница 5: ...positioned at the edge of the cylinder till it is not easily taken out from its seating inside the body of the gear motor 1 2 Fig 7 Adjustment of the mechanical friction exclusively for the model with friction SA41000000 SA412304041 In order to adjust the mechanical friction use an allen spanner size 6 for cylinder head screws with the hexagonal cavity situated in the superior part of the motor fi...