Installation Instructions STACK102
1) Provide 5V DC on pad 1 (4.75V-5.25V)
2) Provide DC ground onto PAD3
3) Connect PAD 2 (IF) to the µPC for signal processing
4) Operating temperature: -10-70°C
PAD1
PAD3
PAD2
NOTICE:
This device complies with Part 15 of the FCC Rules and with RSS-210 of Industry
Canada.
Operation is subject to the following two conditions:
(1) this device may not cause harmful interference, and
(2) this device must accept any interference received, including interference
that may cause undesired operation.
NOTICE:
Changes or modifications made to the equipment not expressly approved by Stack
may void the FCC / IC authorization to operate this equipment.
The use of the transceiver is authorized into mobile or fixed devices taking into
account the conditions listed below :
• OEM Integrator may be sure that the end user manual may not contain any
information about the way to install or remove the module from the final
product.
Microwave Sensor
Installation Instructions