
11
73.0
24.5
Ground Level
4x4 Post
2x4
6.
Install fasteners (not included) in the previously drilled holes and tighten.
7.
Check the alignment of the door in the opening. If necessary, loosen and adjust the brackets for proper
alignment.
Mount To Post Installation
1.
Bury two post
s 24.5” apart with approximately 73” above ground
level. Depending on your soil type you may want to use concrete for
added stability. Attach a 2x4 across the top of the posts.