14
1.
2.
3.
7.
4.
5.
6.
8.
Roughly align the laser using the built-in vial, i.e. set the bubble roughly in the
center of the vial. Set the tripod height approximately as it was for position 1.
Now place laser unit on its tripod directly in front of wall B.
Mark the position of the visible laser dot on wall B (Point 2).
Switch the unit on.
Switch the unit off. Turn the complete unit 180° without altering
the height of the laser. The tripod must not be altered.
Mark the position of the visible laser dot on wall A (Point 1).
Switch the unit on.
Direct the laser beam on wall A.
10.
11.
9.
Mark the position of the visible laser dot on wall B (Point 3), plumb to Point 2)
Switch the unit on.
13.
14.
Switch the unit off. Turn the complete unit 180° without altering
the height of the laser. The tripod must not be altered.
Mark the center of the laser dot on wall A for Point 4.
Measure the corresponding heights of the points , either in relation
to the floor or to the point below, which is classed as being at 0 mm.
It is essential that the plus or minus
signs are calculated correctly.
15.
Switch the unit on.
16.
17.
18.
Direct the laser beam on wall B.
12.
E
F
G
C
I
L
M
K
I
K
C
Vertical check
(motor head tilted 90°)
Roughly align the laser using the built-in vial, i.e. set the bubble roughly in
the center of the vial.
Tilt the motor head 90° in the direction of wall A.
The deflection optics should be set in the end position.
Set up the rotation laser on a tripod directly in front of wall A.
Two parallel wall surfaces at least 5m ( 17 ft ) apart are required for the vertical check.
(P4 – P1) – (P3 – P2)
2s
0,3
mm
m
>
(P4 – P1) – (P3 – P2)
2s
inch
ft
>
23/64“ over 100ft or 1/272”
Содержание LAPR-150
Страница 1: ......
Страница 2: ...O 3a 3b 10 ...
Страница 3: ...A 2 7 6 12 11 1 8 4b 4a 5b 5c 9 5a 13 ...
Страница 4: ...F C B E D G ...
Страница 5: ...I K L M s 17ft H 26ft 39ft max 1 8 3 16 ...