Programming the STEVAL-IDP005V1 2/2
Setup
12
Remove all short cap
jumpers from the
STM32-NUCLEO
Plug the STEVAL-UKI001V1
on the STM32-NUCLEO
respecting the CNx ref.
Programming steps:
a.
Connect the application
board to the ST-LINK/V2-1
via the 10-pin flat cable
plugged on J2 (on the
STEVAL-UKI001V1), then
power-on it.
b.
Connect the ST-LINK/V2-1
with a PC via an USB cable
plugged on CN1.
c.
The ST-LINK/V2-1 will be
recognized as a removable
storage.
d.
To download the firmware
simply copy the .bin file on it.
.bin
1
2
3
4
Содержание STEVAL-BFA001V1B
Страница 3: ...STEVAL BFA001V1B Kit Overview 3 ...
Страница 7: ...Setup and Programming 7 ...
Страница 13: ...Data Monitoring Logging 13 ...
Страница 26: ...How to enable Predictive Maintenance 26 ...
Страница 30: ...Thank you ...