193/317
7 - Debugger and PROM Programmer Tutorial for ST72251
The installation process finishes a short time later. Once it is installed, we can start using it at
once.
If either of the settings in the boxes above has to be changed,you do not need to repeat the
whole installation procedure. Just insert the configuration disk in the reader, and execute the
setup program. It will allow you to change the type of emulator, the port to which it is con-
nected, and the type of probe/chip used.
7.3.3 Using the debugger
7.3.3.1 Loading the application
Start WGDB7. After a delay, the debugger is started and the following box shows up:
07-emu5.bmp
This is the main window of the debugger, that is called the Toolbox. The first thing to do now,
is to load the map file of the project. This file provides all the required information for finding all
other files of the project. Using the File/Open option, we select the hexadecimal file of the
project described in the previous chapter:
07-emu6.bmp
Содержание ST7 Series
Страница 1: ...ST7 8 BIT MCU FAMILY USER GUIDE JANUARY 1999 1 ...
Страница 238: ...238 317 8 C Language and the C Compiler 08 Burn bmp Then use the EPROMer programmer software as described in Chapter 7 ...
Страница 289: ...289 317 10 Second Application a Sailing Computer 10 befor Bs Rw Vw VMG AlphaR AlphaV Before the wind ...