![ST MB467 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/st/mb467/mb467_user-manual_1355486024.webp)
4 Hardware
UM0178
22/37
A soft start function (C
slew
) of V
CC
linear regulator can be obtained by closing jumper J46.
Closing J46 connect an external capacitor to the C
slew
pin of the SPR producing a linear
voltage ramp at the start-up. The SPR uses this linear voltage to limit the slew rate of the
output.
Table 7.
Power supply jumpers
The following jumpers are available for testing purposes and must be closed:
●
Power supply can be partitioned at different points by opening jumpers J22, J26-J29, J30,
J34, J35, J37-J39 and J42.
●
IREF signal to the SPR can be interrupted by opening jumper J45.
Table 8.
Power supply jumpers (testing only)
Name
Figure
Description
J46
Figure 9
Soft start function (C
slew
)
J51
Figure 9
Power supply switch
J48-J50
Figure 9
V
CC
partitioning
J23-J25
Figure 9
V
boost
partitioning
J31-J33, J40-J41, J43-J44
Figure 9
V
buck
partitioning
Name
Figure
Description
J22, J26-J30, J34-J35,
J37-J39, J42
Figure 9
V
boost
partitioning for testing
J45
Figure 9
IREF partitioning
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from