background image

 

 

 Series UAB                                                            Page 1                                Feb 18/2015               

 LT056

 

Series UAB Infrared Heater 

Installation, Operation and Service Instructions 

 

 

Installer 

Read and thoroughly understand these instructions before attempting any installation. 

Owner 

Retain this manual for reference. 

Improper installation, adjustment, alteration, service or maintenance can cause injury, death or property 

damage. Read the installation, operation and service instructions thoroughly before installing or servicing 

this equipment. 

 

563 Barton Street, Stoney Creek, Ontario L8E 5S1

 

 

If you smell gas: 
1. Open windows 
2. Don’t touch electrical switches 
3. Extinguish any open flame 
4. Immediately call your gas supplier

 

 
Il est interdit d‘utiliser des liquides 
inflammables ou degageant des 
vapeurs inflammables, a proximites de 
tout appareil fonctionnent au gaz.

 

Si vous sentez une odeur de gaz: 
1. Ouvrez les fenetres 
2. Ne touchez pas aux interupteurs 
    electriques 
3. Eteignez tout flamme nue 
4. Contactez immediatment votre 
    fournisseur de gaz 

 

 

Do not store or use gasoline or other 
flammable vapors and liquids in the 
vicinity of this or any other appliance. 

FOR YOUR SAFETY 

FOR YOUR SAFETY 

CONSIGNES DE SECURITE 

CONSIGNES DE SECURITE 

WARNING 

Содержание UAB SERIES

Страница 1: ...reet Stoney Creek Ontario L8E 5S1 If you smell gas 1 Open windows 2 Don t touch electrical switches 3 Extinguish any open flame 4 Immediately call your gas supplier Il est interdit d utiliser des liqu...

Страница 2: ...an automatic ignition device Do not attempt to light the burner by hand Failure to comply could result in a serious fire and personal injury hazard CAUTION MECHANICAL HAZARD Do not use high pressure a...

Страница 3: ...EARANCE TO COMBUSTIBLES 9 INSTALLATION 11 Installation Sequence 11 VENTING COMBUSTION AIR DUCTING 22 General Requirements 22 Un vented Operation 23 Vented Operation 23 Horizontal Venting 23 Vertical V...

Страница 4: ...field assembled low intensity infrared heaters that are easy to install and maintain and which were engineered with significant input from our customers They are designed to provide economical operat...

Страница 5: ...Codes in Canada Public Garages Installation in public garages must conform to the Standard for Parking Structures NFPA 88A or the Standard for Repair Garages NFPA 88B in the US and CAN CGA B149 1 and...

Страница 6: ...e Gas Minimum Maximum 11 5 W C 14 0 W C Manifold Pressure Natural Gas 3 5 W C Propane Gas 10 5 W C Inlet Connection Natural Gas Or Propane Gas 1 2 female NPT Electric Supply 120 VAC 60 HZ 1 Amp 36 cor...

Страница 7: ...ure 1 Burner General Dimensions Figure 2 Basic Component Dimensions 8 8 8 8 30 7 7 5 9 0 14 0 4 5 10 7 10 4 REFLECTOR 10 TYPICAL 14 18 0 R8 0 U BEND 24 18 ELBOW 16 WHEN INSTALLING ORIENT BAND CLAMP LO...

Страница 8: ...0 40 6 UAB 125 125 000 40 50 6 UAB 150 150 000 40 60 6 UAB 175 175 000 50 60 UAB 205 205 000 60 70 Table A Burner Rates and Baffle Configuration Information Note Baffles are always placed in the last...

Страница 9: ...surfaces and other materials which may be damaged by radiant or convective heat Combustible materials are considered to be wood compressed paper plant fibres plastics Plexiglas or other materials capa...

Страница 10: ...6 4 71 64 6 4 74 67 6 4 78 72 One Side Extension D A C B A B C D 2 4 50 35 2 4 58 38 2 4 63 42 2 4 73 45 4 4 76 50 4 4 77 52 6 6 80 54 6 6 84 56 U Tube Horizontal D A B C A B C D 2 22 58 20 2 23 59 20...

Страница 11: ...lifts etc Figure 3 provides a general overview of the components utilized in the installation as well as their general relationship Figure 3 Radiant Line System Component Relationships Gasket Burner A...

Страница 12: ...feet away Thereafter 10 feet apart on average is acceptable for the remainder of the heat exchanger At no time should hangers be more than 12 feet apart refer to Figure 4 Figure 4 Heater Hanging Point...

Страница 13: ...d burner location The other end of the tube should have the first coupling already loosely fitted as shown in Figure 6 below Install the reflector brace 6 12 from burner as shown in Figure 6 below Fig...

Страница 14: ...is installed Tighten band clamps alternately to prevent buckling of the sleeve set to Torque listed in Figure 8 Ensure that the weld seams on ALL other Tubes are facing down Figure 8 Coupling Install...

Страница 15: ...the burner cup should be in a 12 o clock position Figure 9 Burner Installation Note For all coupling joints ensure that the tube joint is in the center of the coupling length and that the overlap joi...

Страница 16: ...ed as heat exchanger is placed since it is more difficult to do so once the reflector is in position Reflectors should overlap adjacent reflectors 4 to 6 inches Note Be sure not to tile reflector sect...

Страница 17: ...racket as shown in Figure 11 The remaining reflector overlap joints and reflector brackets are left loose to accommodate system movement refer to Figure 3 for more details Figure 13 Securing Reflector...

Страница 18: ...out install 90 elbows or U tube where indicated Refer to Figure 15 for details Elbows or U Tubes must be located not less than 10 feet from the burner on model UAB 80 and smaller not less than 15 feet...

Страница 19: ...n Figure 16 below Figure 16 End Cap Installation Endcap Elbow Detail Couplings Hanger Location U Tube Detail Couplings Endcap Endcap Hanger Location Endcap Hanger Location Insert End Cap into reflecto...

Страница 20: ...Reflector Hanger Side Reflector Bracket approx 48 apart 8 x 3 8 Screw 8 x 3 8 Screw Reflector 8 x 3 8 Screws Notch the Side Reflector for Reflector Brackets and Hangers Side Reflector Reflector Side...

Страница 21: ...2015 INSTALLATION SEQUENCE Bottom shields need not overlap Each 5 feet section is held with two support brackets Figure 18 Bottom Shield Installation Tighten Screw Tubing Section Support Bracket Bott...

Страница 22: ...from any opening through which vent gases could enter a building Extend beyond any combustible overhang Be installed at a height sufficient to prevent blockage by snow Optional outside air supply may...

Страница 23: ...ons Vented Operation In all cases be sure vent pipes and outside air supply ducts are sealed with approved sealant such as high temperature RTV silicone Horizontal Venting When venting through a combu...

Страница 24: ...installation code Refer to ANSI Z223 1 and CAN CGA B149 1 and B149 2 for sizes and installation information For vertical venting refer to ANSI Z223 1 and CAN CGA B149 1 and B149 2 Fan Assisted Categor...

Страница 25: ...INPUT OF 250 000 BTUH OR GREATER 2 WALL THIMBLES AND VENT TERMINALS MUST TO BE USED WITH SINGLE WALL HORIZONTAL VENTING THROUGH COMBUSTIBLE WALLS WALL THIMBLE MAY BE REPLACED BY FLASHING WHERE THE VEN...

Страница 26: ...roved type and should be located at an elevation equal to or below the vent terminal elevation to prevent back venting of flue gases into the burner compartment Install single wall pipe or PVC pipe an...

Страница 27: ...verify that high pressure testing of the system has been completed Failure to do so may expose the burner components to damaging high pressure requiring replacement of key components Flexible gas conn...

Страница 28: ...to Figure 24 for guidance on electrical wiring of heaters If any of the original wire as supplied with the heater must be replaced it must be replaced with wiring having a rating of at least 105 C tem...

Страница 29: ...diagram showing how to connect a heater to a 24 volt thermostat Note This will not give a post purge Figure 25 24 Volt Wiring Diagram White Black Black 120V 60 HZ Supply Voltage Black White Thermostat...

Страница 30: ...me is detected the ignition sensing rod reads a rectification signal and the gas valve remains open The sparking stops when the flame signal is established If no flame is detected the gas valve closes...

Страница 31: ...excessive wear or erosion breakage or other defects Be sure the burner observation window is clean and free of cracks or holes Clean or replace as necessary Check the flue pipe for soot or dirt and r...

Страница 32: ...r the ignition module is faulty Typically if the burner is being fired for the first time in the new heating season and ran fine the year before this is a sign of some nesting inside the orifice adapt...

Страница 33: ...place If Damaged Is Gas Present At Valve Is Gas Pressure Sufficient Rectify As Required YES Unplug Motor Does Motor Impeller Spin Freely Check Air Lines To Switch Check Burner System For Obstruction R...

Страница 34: ...7 7 ITEM 8 PART BLOWER MOTOR 205 000 BTU DESCRIPTION CE013 10 SPARK ELECTRODE CE002 UG001 UG007 CE028 CE025 CE029 CE023 AIR SWITCH MODELS 40 000 BTU AIR SWITCH MODELS 60 000 80 000 100 000 BTU AIR SWI...

Страница 35: ...Series UAB Page 35 Feb 18 2015 PARTS LIST...

Страница 36: ...pense or consequential damages of any kind This warranty does not cover any shipping installation or other labor costs incurred in the repair or re placement of the product No materials will be accept...

Отзывы: