background image

SRNE Solar Co., Ltd.

4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China

T: +86 0755-26458295

F: +86 0755-27325578

E: [email protected]

W: www.srnesolar.com

Page 34 of 48

File version: V1.0

② Battery Real-Time Data

③ AC input Real-Time Data

④ AC Loads Real-Time Data

Содержание SR-EOV48 Series

Страница 1: ...13A Wutong Island Neihuan Road Xixiang Shenzhen China T 86 0755 26458295 F 86 0755 27325578 E master szshuori com W www srnesolar com Page 1 of 48 File version V1 0 SR EOV48 Vertical Energy Storage S...

Страница 2: ...duct should be used in compliance with local standards laws and regulations because any non compliance with the use may lead to personal injuries and property loss The drawings provided in this Manual...

Страница 3: ...of risk which if not avoided could result in minor or moderate injuries NOTICE Warning information about device or environment safety If not avoided equipment damage data loss performance degradation...

Страница 4: ...regulations and codes shall be followed The safety precautions in this Manual are only supplements to local laws regulations and codes The Company shall not be liable for any of the following circumst...

Страница 5: ...OTICE After the device is installed the empty packing materials such as cartons foam plastics and cable ties shall be removed from the device area 2 1 3 Personnel Safety When operating the device appr...

Страница 6: ...ot stand lean or sit on the device Do not damage any modules of the device 2 2 Personnel Requirements The personnel in charge of installation and maintenance must be strictly trained to understand all...

Страница 7: ...emoving the device the protective grounding wire must be removed at last It is forbidden to destroy the grounding conductor It is forbidden to operate the device without a grounding conductor installe...

Страница 8: ...taic mains battery and loads and has the function of photovoltaic and mains charging The photovoltaic charging module adopts the latest optimized MPPT tracking technology which can quickly track the m...

Страница 9: ...requency Charge Current Max PV Power SR EOV48 5 0S S1 5 12kWh 5000W 230Vac 50Hz 0 80A 5000W SR EOV48 5 0U S1 5 12kWh 5000W 120Vac 60Hz 0 80A 5000W SR EOV48 10 0S S1 10 24kWh 5000W 230Vac 50Hz 0 80A 50...

Страница 10: ...y level 5 0 The system capacity is 5kWh 10 0 The system capacity is 10kWh Output voltage U The output voltage is 110V S The output voltage is 220V Product category S Energy storage system E Energy sto...

Страница 11: ...rtically mounted EOS wall mounted System voltage 24 24V system 48 48V system Energy storage capacity level 5 0 The system capacity is 5kWh 10 0 The system capacity is 10kWh Energy storage battery type...

Страница 12: ...E master szshuori com W www srnesolar com Page 12 of 48 File version V1 0 3 5 Appearance Description 3 5 1 Dimentions Inverter dimensions L W H 600 184 500mm Battery dimensions L W H 600 184 610mm Bas...

Страница 13: ...tery USB RS485 1 Dry contact Start generator PV input port AC output port AC input port PV input switch AC output switch AC input switch Battery switch Battery Negative Battery Positive Cooling fan Fa...

Страница 14: ...szshuori com W www srnesolar com Page 14 of 48 File version V1 0 3 5 3 Energy Storage Battery Module Turn On Off LED SOC LED ALM LED RUM Address RS232 RS485 1 Connect inverter CAN Connect inverter RS4...

Страница 15: ...n Scenarios The lithium iron phosphate batteries with high performance and long service life are used in the energy storage module Meanwhile the modular structure design is adopted Each energy storage...

Страница 16: ...File version V1 0 When the mains is disconnected or stops working the battery supplies power to the load through the power module 4 1 2 Application Scenarios with Only Photovoltaic but No Mains Power...

Страница 17: ...e 17 of 48 File version V1 0 4 1 3 Complete Application Scenarios During the day the mains and photovoltaic simultaneously charge the battery and supply power to the loads At night the mains supplies...

Страница 18: ...internal damage and check the type of energy storage If there is any abnormality on the package or model of the energy storage is inconsistent do not open it and contact us as soon as possible Inspect...

Страница 19: ...r com Page 19 of 48 File version V1 0 5 2 Preparation of Tools and Meters Types Tools and meters Installation tool Personal protective equipment 5 Mounting Frame Screw 2 N 1 M8 60 expansion bolt Batte...

Страница 20: ...ill be affected by sea breezes The areas affected by the sea breezes vary depending on meteorological conditions e g typhoons monsoons or topographical conditions dams hills Do not install in the plac...

Страница 21: ...m Page 21 of 48 File version V1 0 5 4 Device Installation 5 4 1 Installation Location Selection Determine the installation location please choose a flat ground and a solid wall as the installation loc...

Страница 22: ...ANGER CAUTION According to the hole position drill 2 holes on the ground and 4 holes on the wall 8 depth 45 50mm Tap the M8 screw into the above hole and screw on the nut 5 4 3 Mounting the base Faste...

Страница 23: ...srnesolar com Page 23 of 48 File version V1 0 5 4 4 Install Battery Pack CAUTION Place the battery on the base and then tighten the fixing screws on both sides Install the second battery in the same w...

Страница 24: ...ihuan Road Xixiang Shenzhen China T 86 0755 26458295 F 86 0755 27325578 E master szshuori com W www srnesolar com Page 24 of 48 File version V1 0 5 4 5 Install Inverter The installation method of the...

Страница 25: ...between AC output and power module Cable diameter 10mm2 7AWG Prepare by the user itself 6 2 Internal Electrical Connection of Energy Storage 6 2 1 Connecting Power Cord Before connecting the energy st...

Страница 26: ...Ltd 4 5F 13A Wutong Island Neihuan Road Xixiang Shenzhen China T 86 0755 26458295 F 86 0755 27325578 E master szshuori com W www srnesolar com Page 26 of 48 File version V1 0 Power Cable Power Cable...

Страница 27: ...r szshuori com W www srnesolar com Page 27 of 48 File version V1 0 6 2 3 Connecting Signal Line The signal line delivered with the product together shall be used to connect RS485 2 interface for each...

Страница 28: ...in parallel the address of the energy storage battery module needs to be set The address is set to 1 4 and the address of each module cannot be repeated NOTICE 6 3 External Electrical Connection of En...

Страница 29: ...g please pay attention to L and N and avoid short circuit 6 3 3 Connecting Photovoltaic Input According to the cable sequence and terminal position shown in the figure below correctly connect the PV i...

Страница 30: ...s Yes No 3 The power cord is correctly connected The positive and negative terminals are connected correctly without any missing Yes No 4 The signal line is correctly connected The signal line is conn...

Страница 31: ...rmation turn on the switch of the energy storage battery module If there are multiple modules please turn on the power switch one by one according to the address sequence After the power switch is tur...

Страница 32: ...ent Short Current OFF ON LED blinking description Blinking LED ON LED OFF Blinking1 0 25S 3 75S Blinking2 0 5S 0 5S Blinking3 0 5S 1 5S 7 2 3 Capacity Indicator Capacity indicator LED SOC 0 25 25 50 5...

Страница 33: ...e 33 of 48 File version V1 0 7 3 Inverter LCD Function Description After the power module works normally the LCD is described as follows 7 3 1 Real time Data Viewing The main page displays the primary...

Страница 34: ...ong Island Neihuan Road Xixiang Shenzhen China T 86 0755 26458295 F 86 0755 27325578 E master szshuori com W www srnesolar com Page 34 of 48 File version V1 0 Battery Real Time Data AC input Real Time...

Страница 35: ...rnesolar com Page 35 of 48 File version V1 0 Inverter Real Time Data 7 3 2 Real time Curve Real time curves include the following curves Load Power curve Battery Voltage curve Battery Current curve PV...

Страница 36: ...V1 0 charge historical data of battery discharge historical data of load consumption historical data of load consumption of AC historical data of AC charging 7 3 4 Fault information Fault information...

Страница 37: ...riority mode switching to inverter only when the AC fails Bat priority mode Switching to the AC only when the battery is under voltage or lower than the set value of parameter Charge Source Charge Sou...

Страница 38: ...hen China T 86 0755 26458295 F 86 0755 27325578 E master szshuori com W www srnesolar com Page 38 of 48 File version V1 0 Max AC Charge Current Data Time 7 3 Install The Cover Plate When all wiring is...

Страница 39: ...one year Running status of system Observe whether the energy storage appearance is damaged or deformed Listen to whether the energy storage has any abnormal sound during running When the energy storag...

Страница 40: ...rrent software protection 11 PvBuckOCHw No Buck overcurrent hardware protection 12 bLineLoss No Mains power down 13 OverloadBypass Yes Bypass overload protection 14 OverloadInverter Yes Inverter overl...

Страница 41: ...t Restart the unit to resume load output Inverter short circuit protection Check the load connection carefully and clear the short circuit fault points Re power up to resume load output PV overvoltage...

Страница 42: ...be disposed in accordance with local safety regulations 13 The battery should be stored and recharged in accordance with this User s Manual 14 Do not reverse polarity of the battery when storing or tr...

Страница 43: ...mmended to clean and maintain the product from time to time When cleaning the dust and stains on the product shall be removed with a piece of soft dry cloth or vacuum cleaner especially when cleaning...

Страница 44: ...110 120Vac Input Voltage Range 90 280Vac 90 140Vac AC Output Rated Output Power 5000W 5000W Maximum Output Current 30A 50A Frequency 50Hz 60Hz Overload Current 35A 55A PV Charge Solar Charge Type MPPT...

Страница 45: ...attery Capacity 100AH Battery Rated Voltage 51 2V Battery Working Voltage Range 44 8 57 6V Maximum Charging Current 100A Maximum Discharging Current 100A DOD 80 Parallel Quantity 4 Designed Life span...

Страница 46: ...f the inverter module is 600 184 500mm the external dimensions of the energy storage battery module is 600 184 500mm the external dimensions of the base module is 680 184 80mm 10 2 Package Dimensions...

Страница 47: ...List NO Picture Item Quantity Specification Source 1 Inverter 1 3 5kW 24V 110V 220V Inverter Package 2 Battery 1 5 12kWh 25 6V Battery Package 3 Base 1 680 184 80mm Inverter Package 4 Mounting Frame...

Страница 48: ...Xixiang Shenzhen China T 86 0755 26458295 F 86 0755 27325578 E master szshuori com W www srnesolar com Page 48 of 48 File version V1 0 9 Power cable 1 560mm 4AWG Battery Package 10 Signal cable 1 700...

Отзывы: