Srne ML4860 Скачать руководство пользователя страница 6

Step 1: choose the installation site

   Do not install the controller at a place that is subject to direct sunlight, high temperature or 

water intrusion, and make sure the ambient environment is well ventilated. 

Step 2: fit screws in

   According to the installation dimensions of the product, use a marker pen to mark the mounting 

points, then drill 4 mounting holes at the 4 marked points, and fit screws in.

Step 3: fix the controller

   Aim the controller's fixing holes at the screws fit in Step 2 and mount the controller on.

Step 4: wire

   First remove the two screws on the controller, and then begin wiring operation. In order to 

guarantee installation safety, we recommend the wiring order as indicated by the numbers in the 

following diagram (Fig. 2.3); however, you can choose not to follow this order and no damage will 

be incurred to the controller.

Fig. 2.2 Wiring sequence

1

2

3

4

5

6

7

8

9

Te

m

p

e

ra

tu

re 

Fig. 2.3 Wiring sequence

7

Connecting to external temperature sampling interface and connecting battery voltage 

compensation cable

Connecting communication cable

Connecting power cable


  

  Warning:

 risk of electric shock! We strongly recommend that fuses or breakers be connected at 

the photovoltaic array side, load side and battery side so as to avoid electric shock during wiring 
operation or faulty operations, and make sure the fuses and breakers are in open state before 
wiring.
    

Warning:

 danger of high voltage! Photovoltaic arrays may produce a very high open-circuit 

voltage. Open the breaker or fuse before wiring, and be very careful during the wiring process.
    

Warning:

 risk of explosion! Once the battery's positive and negative terminals or leads that 

connect to the two terminals get short-circuited, a fire or explosion will occur. Always be careful in 
operation.
    First connect the battery, then the solar panel, and finally the load. When wiring, follow the order 
of first "+" and then "-".

   

 Power on

    After connecting all power wires solidly and reliably, check again whether wiring is correct and if 
the positive and negative poles are reversely connected. After confirming that no faults exist, first 
close the fuse or breaker of the battery, then see whether the LED indicators light up and the LCD 
screen displays information. If the LCD screen fails to display information, open the fuse or breaker 
immediately and recheck if all connections are correctly done.
    If the battery functions normally, connect the solar panel. If sunlight is intense enough, the 
controller's charging indicator will light up or flash and begin to charge the battery.
    After successfully connecting the battery and photovoltaic array, finally close the fuse or breaker 
of the load, and then you can manually test whether the load can be normally turned on and off. For 
details, refer to information about load working modes and operations.
    

Warning:

 when the controller is in normal charging state, disconnecting the battery will have 

some negative effect on the DC loads, and in extreme cases, the loads may get damaged.
   Note that the battery's fuse or breaker shall be installed as close to the controller as possible, and 
it's recommended that the installation distance be not more than 150mm.

    Note: 

   

1) If no temperature sensor is connected to the controller, the battery temperature value will 

stay at a default of 25 °C. 
   2) If an inverter is deployed in the system, directly connect the inverter to the battery, and 
do not connect it to the controller's load terminals.

3. Product Operation and Display

3.1 LED Indicators




①---

②---

③---

④---

Charging mode

Battery status

Load status

Abnormality indication

PV array indicator

BAT indicator

LOAD indicator

ERROR indicator

8

  V
-c

o

m

p

e

n

sa

ti

o

n

 i

n

te

rf

a

c

e

(B

a

tt

e

ry

R  4

8

5 c
o

m

m

u

n

ic

a

ti

o

n

 i

n

te

rf

a

c

e

Содержание ML4860

Страница 1: ...ual Model Battery voltage Max solar panel voltage Max input power Charging current Discharging current ML4860 12V 24V 36V 48V 150V 25 C 145V 25 C 800W 12V 1600W 24V 2400W 36V 3200W 48V 60A 20A Specifi...

Страница 2: ...ause damage Tips means advice or instruction for the operator Table of Contents 1 Product Introduction 1 1 Product Overview 1 2 Product Features 1 3 Exterior and Interfaces 1 4 Introduction to Maximum...

Страница 3: ...istorical data storage function is available and data can be stored for up to a year The controller is equipped with an LCD screen with which users can not only check device operating data and statuse...

Страница 4: ...t characteristic curve 1 5 Charging Stages Introduction As one of the charging stages MPPT can t be used alone but has to be used together with boost charging floating charging equalizing charging etc...

Страница 5: ...nstalling the battery For open lead acid batteries wear a pair of goggles during installation and in case of contact with battery acid flush with water immediately In order to prevent the battery from...

Страница 6: ...s be careful in operation First connect the battery then the solar panel and finally the load When wiring follow the order of first and then Power on After connecting all power wires solidly and relia...

Страница 7: ...current day Device information Bluetooth connection state This menu is available only to the display units with the optional bluetooth function Refer to Usage of Navigation Keys for operations includ...

Страница 8: ...DV over discharge BAT OVD over voltage BAT UVW under voltage warning L SHTCRT load short circuit L OVRCRT load over current internal over temperature battery over temperature solar panel overpower sol...

Страница 9: ...BstChgVol 9 0 17 0V 3 Floating charging voltage FltChgVol 9 0 17 0V Boost charging recovery voltage BstChgRev Over discharge recovery voltage LowVolRev Under voltage warning level UndVolWrn 4 Over dis...

Страница 10: ...the load mode setting 3 Press and hold in any menu but not the setting mode if the current load mode is manual mode pressing and holding the key will switch on off the load if the current load mode is...

Страница 11: ...value the load will cut off output after a time delay Load short circuit protection When the load is short circuited the controller can implement protection in a quick and timely manner and will try...

Страница 12: ...2V default 35 C to 45 C IP32 3 6kg RS232 RS485 3000m 285 205 93mm 5 2 Battery Type Default Parameters When selecting User the battery type is to be self customized and in this case the default system...

Страница 13: ...ion Efficiency 6 3 48V System Conversion Efficiency MPPT 24V conversion efficiency 24V battery 80 82 84 86 88 90 92 94 96 98 100 40 80 160 480 800 1200 1600 Output power W 40Vmp 60Vmp 80Vmp 90Vmp 110V...

Отзывы: