Delay configuration
6.
Operate with the IST16 software
The IST16 typical sequence is as following:
1.
First step: storage of the sample in different loops at programmed time.
2.
Second step: loops are injected and analyzed one after the other.
3.
Third step: loops are cleaned with the flowing gas coming from the TGA at the end of the GC
analysis sequence.
The storage sequence can only be started when the interface oven temperature is steady. Before each
injection of a loop, the software checks that the gas chromatograph is in a ready state (green color). The
GC cycle time must correspond to the GC analysis time. It is used to adjust the delay between two injection
loops.
6.1
Washing
The washing sequence can be started when the IST16 is idle by checking the Washing option and clicking on
the
Start
button.