background image

1008290 Rev. C

10

READ BEFORE USING

Now You Are Ready To Put 
Material In The Hopper

WARNING:

  Avoid Injury!  Chemicals can be 

dangerous.  Avoid injury to operators or bystanders.

•  Make sure the rate gate is in the closed position.

•  Read chemical container label for handling 

instructions.  A Material Safety Data Sheet (MSDS) 
should be supplied by the chemical dealer and 
provides proper safety information.

•  Wear proper clothing and safety equipment while 

handling or applying chemicals.

•  Prohibit all smoking, drinking, and eating around 

chemicals.

•  When spreading products containing herbicides, 

exercise extreme caution with respect to careless 
spreading and to wind-drift.  Contact Of Some 
Products On Some Plants Can Be Fatal.

•  Fill the spreader on a fl at, level surface only.  Fill on 

sidewalk, driveway, cardboard, etc. to avoid material 
loss.

• When 

fi lling hopper with material, always use screen 

to help break up clumps.

Now You Are Ready To Spread

•  Keep spinner blade clean.  Excess material build-up 

can cause an uneven spread pattern.

•  Keep the impeller level when spreading.

•  DO NOT overload.  Maximum capacity is 120 lbs.

•  DO NOT use on windy days.

•  Spread header strips at the ends of the area 

OPPOSITE of the direction of spreading.  This will 
provide a "turn-around" area, an area to re-align the 
spreader for the return spread.

•  Example shown is for 6 ft. wide spread.  Make the 

fi rst spread pass at one-half the spread width from 
the edge of the spreading area or in this case, 
approximately 3 feet (or one big step).

•  Additional spreading passes will be at the full spread 

width or approximately 6 ft. apart.

•  TAKE A SIGHTING AT THE FAR END.  Keep your eye 

on the sighting as you spread.  You will not need 

to wonder where you are or where you have been.  
Continue until spreading is completed.

•  Left over fertilizer can be spread under trees and 

other high feeding areas without showing "edge of 
spread" lines.

Tip:  

When not spreading, and if pushing the spreader 

some distance, tip the spreader so only the idle wheel is 
on the ground.

Header

6’

6’

3’

Header

Cleaning The Spreader Is Part 
Of The Spreading Job

Clean and oil spreader immediately after each use.

Method #1 - Wipe spreader thoroughly with an oily cloth.  
Oil all bearings and bearing areas.

Method #2 - Wash, rinse, and dry the spreader.  Note:  
Drying takes time.  Moisture trapped in bearing areas is 
slow to go.  Immediately after drying - oil all bearings and 
moving parts.  Make certain all operations are thorough.

NOTE:  Good "Dry Cleaning" is preferable to poor "Wet 
Cleaning".

•  It is virtually impossible to have rust and corrosion on 

a clean, dry, oiled surface.

•  Again - just before using - oil all bearings and moving 

parts.

•  In storage, ideally the spreader should be hung by 

the handle.  In any case, do not pile weight on the 
spreader, as excess weight over a period of time can 
distort the tires.

Oil Bearings And All Moving 
Parts

Make sure the spreader is running freely!

Содержание S60-12020

Страница 1: ...rinly Hardy Co Model S60 12020 Spyker Spreaders Contact Us at 800 972 6130 This manual contains information for the safety of persons and property Read it carefully before assembly and operation of th...

Страница 2: ...C 2 63 68 27 61 60 61 27 74 74 28 26 71 71 21 62 55 54 28 74 30 43 53 52 34 35 22 38 56 40 4 40 46 45 47 44 48 26 50 41 27 51 49 42 33 57 37 36 74 25 23 39 Rate Gate Explosion Hopper Explosion Handle...

Страница 3: ...12 20 17 5 6 24 1 72 64 65 66 73 19 16 8 7 9 18 16 7 11 15 13 10 As needed for shimming 10 74 67 68 31 74 29 32 2 77 68 3 3 70 74 3 2 27 27 68 68 67 70 3 59 70 59 76 75 69 10 10 29 Frame Explosion Spi...

Страница 4: ...8 Bolt HexHd 1 4x1 2 SS 36 1008250LH 1 Brace Hopper LH 37 1008250RH 1 Brace Hopper RH 38 1008271 1 Hopper 120 Drilled No Part Number Qty Description 39 05 94 0064 6 Washer Nylon 40 05 90 0121 4 Bolt...

Страница 5: ...t On the drive wheel side install 3 16 x 1 3 4 Clevis Pin and Cotter Pin Figure 1 On opposite side install wheel washer and Rue Ring Locking Pin on outside of wheel NOTE Extra wheel washers are provid...

Страница 6: ...mbly sideways and insert end of linkage into rate gate linkage Figure 4 6 Install handle to frame as shown using 1 4 x 1 3 4 Bolts and Locknuts NOTE You ll need to orient and install the cable bracket...

Страница 7: ...and lower spinner shafts interlock grooves Slide coupler down over shafts Ensure the factory installed felt washer is on the lower spinner shaft Figure 6 COUPLER UPPER SPINNER SHAFT FELT WASHER LOWER...

Страница 8: ...ng that can get caught in moving parts Always wear eye protection when operating the equipment Stay alert for holes in the terrain and other hidden hazards Watch out for traffic when crossing or near...

Страница 9: ...dge Of Spread lines Gaps and double overlaps are less likely Small errors in travel are forgiven and do not show WARNING When spreading products containing herbicides exercise extreme caution with res...

Страница 10: ...spread Make the first spread pass at one half the spread width from the edge of the spreading area or in this case approximately 3 feet or one big step Additional spreading passes will be at the full...

Страница 11: ...ADING CHART Product Bag Weight Sq Ft Coverage Dial Setting Full Rate Dial Setting Half Rate Spread Width Blue Grass or Red Top 5 lbs 1 000 1 25 4 1 lbs 1 000 2 0 4 2 lbs 1 000 2 5 4 Park Merion Delta...

Страница 12: ...l not be liable for any loss damage or expense including but not limited to consequential or incidental damages arising from the operation condition or use of the item The sole and exclusive remedy ag...

Отзывы: