1007895 Rev. D
6
8. Install Linkage to Lever as shown in Figure 8.
9. Turn Handle Assembly sideways and install
Linkage into Rate Gate Lever as shown in
Figure 9.
7. Inside the hopper, assemble the Felt
Washer and Agitator Wire onto the Spin-
ner Shaft as shown in Figure 7.
NOTE: Notice orientation and sweep of
Agitator Wire (Shown in Figure 7).
Figure 6
Figure 7
Figure 8
Figure 9
6. Install Wheel on the opposite side of the Axle
(valve stem out) until it touches Axle Bearing and
Washer. Install Washer onto Axle.
Push Rue Ring Locking Pin through Axle hole.
NOTE: Rue Ring Locking Pin will snap into
position as shown in Figure 6.
Turn Spreader assembly over and place on
ground.