p i c lt d .co m
11
To stop J eepmeter
opErATIoNs
STEP 1:
Switch OFF the power on the holiday detector.
STEP 2:
Turn the power “OFF” on the JeepMeter.
STEP 3:
After steps 1 and 2 are complete, disconnect the test leads
and secure the JeepMeter back in its case.
STEP 6:
Set the input switch to Pulse or DC position to match which
input terminal is being used.
STEP 7:
After, and ONLY AFTER, double checking that all the
connections in Steps 1 through 6 are correct, place the JeepMeter
power switch to “ON” position.
STEP 8:
After the digital readout settles to zero then power on the
holiday detector by switching the holiday detector to the “ON” position.
Then read the output voltage directly on the JeepMeter digital display.
Содержание JeepMeter
Страница 1: ...Spy Jeepmeter operating instructions PIPELINE INSPECTION COMPANY picltd com...
Страница 17: ...picltd com 17 User notes...
Страница 18: ...18 picltd com User notes...
Страница 19: ...picltd com 19...
Страница 20: ...PIPELINE INSPECTION COMPANY picltd com...