5
Tower Shipment
Unless otherwise specified, NCWD towers ship by truck (on flat bed trailers),
which lets you receive, hoist, and install the tower in one continuous operation.
Single-cell towers ship on one truck. Multicell towers, depending on their size,
may require more than one truck.
Responsibility for the condition of the tower upon its arrival belongs to the
trucker—as does the coordination of multiple shipments, if required.
Receiving Tower
Prior to unloading the tower from the delivering carrier, inspect the shipment
for evidence of damage in transit. If damage is apparent, note the freight bill
accordingly. This will support your future recovery claim.
Find and remove the installation instruction drawings and bills of material
located in a plastic container in the cold water basin. This information should
be kept for future reference and maintenance purposes.
Hoisting Tower
The NCWD tower consists of two modules per cell. The upper module includes
hoisting clips at the top of the module. The hoisting clips on the lower module
are located near the bottom on the sides of the cold water basin.
NCWD upper and lower modules must be hoisted and set separately.
Do not preassemble modules prior to hoisting.
A Hoisting-Installation label which has hoisting dimensional information is
located on the side casing near the tower centerline. Remove tower from the
carrier and hoist into place according to the instructions on the label.
Hoisting clips are provided for ease of unloading and positioning
tower. For overhead lifts or where additional safety is required,
safety slings should also be placed under the tower. Under no
circumstances should you combine the top and bottom modules
of modular models and attempt to hoist them at the same time by
utilizing the hoisting clips alone!
Caution
Warning
receiving and hoisting
Содержание Marley NCWD
Страница 31: ......