Check the following before starting the pump:
that the shaft guard has been fitted properly
that there is free access for liquid and the pump is primed
that the valve on the discharge side (if fitted) is closed
The valve on the discharge side is closed during startup to prevent
the motor from overloading, but should be opened again as soon as
the pump has been started.
Note !
The Ws+ pump should not be left running too long without
pumping (typically 15 minutes, if the pumped liquid is not hot), as it
gets warm and loses priming liquid by evaporation.
4.1 Flushing water.
In pumps with a flushed shaft seal, check that the supply of flushing
medium is open and that the flow of the medium is adequate
(approx. 1530 l/hour).
5.1 Checking the shaft seal
Check the pump's shaft seal for leaks on a regular basis. If the shaft
seal is leaking, replace it or its relevant parts as described below.
5.2 Replacing the shaft seal
The sectional drawing shows the pump and position and construction
of the shaft seal both ordinary seals and seals with water flushing.
To replace the shaft seal, it is necessary to dismantle the pump as
described below. The sectional drawing is to be used for reference.
1.
Disconnect the power supply in the motor isolator by removing the
fuses and disconnecting the cables.
2.
Turn off the flushing water supply.
3.
Close the inlet and discharge of the pump, and drain the pump/
screw housing.
If the pump is used for hot and/or aggressive liquids, special
precautions must be taken. In such cases, observe the local
regulations for personal protection when working with these
products.
4.
Once the inlet and outlet pipes have been properly isolated and
the recirculation connection (if fitted) removed, remove the clamp
ring (item 25) and front cover (item 27).
5.
Unscrew the air screw (item 2) (use a pipe Cspanner or a round
bar in the balance hole in the shaft muff to secure the shaft).
Then open the clamp ring (item 9), take off the pump/screw
housing (item 1) and remove the impeller (item 4).
Dismantling the pump
4. Putting the pump into service
5. Maintenance
Содержание APV Ws+
Страница 2: ......
Страница 6: ......
Страница 17: ......
Страница 19: ...Instruction Manual Ws Pump Read and understand this manual prior to operating or servicing this product...
Страница 20: ......
Страница 22: ...453198 ISS S 03 2005 16 Ws Sectional Drawing Section 1 Shaft size 25 and 35 Section 2 Shaft size 25 and 35...
Страница 24: ......
Страница 35: ......
Страница 38: ......
Страница 43: ...34 453263 ISS T 09 2005 381340 ISS S 03 2005 7 Pumpe komplet Pump complete Standard Ws...
Страница 58: ......