Specifications

Marley 

/

 

MD

 

Cooling Tower 

/

 

Specifications: Options

 

38

Specification Value

start and stop control, bypass/VFD selec-

tion, Auto/Manual selections, manual 

speed control. To prevent heating prob-

lems in the cooling tower fan motor and 

to assure proper gear reducer lubrication 

the VFD system shall de energize the 

motor once 25% motor speed is reached 

and cooling is no longer required. The 

cooling tower manufacturer shall supply 

VFD start-up assistance. Tower vibration 

testing throughout the speed range is 

required to identify and lockout any natu-

ral frequency vibration levels which may 

exceed CTI guidelines.

 

 

Miscellaneous Options

 

Equalizer Flume Weir Gates:

11.2

  

Add the following paragraph under 

Cold Water Collection Basin:

 The 

interconnecting flume between cells 

shall be equipped with a removable 

cover plate to permit the shutdown of 

one cell for maintenance purposes, or 

to permit independent cell operation. 

 

Premium Efficiency Motor

6.3

 

Replace paragraph 6.3 with the fol-

lowing:

 The complete mechanical 

equipment assembly for each cell 

shall be supported by a rigid, hot-dip 

galvanized steel structural support that 

resists misalignment between the 

motor and sheaves (pulleys). For belt-

drive towers with motors inside the 

airstream, motors shall be mounted on 

an adjustable base that swivels outside 

the access door for maintenance. For 

belt-drive towers with motors mounted 

outside the airstream, a protective 

cover shall be mounted over the motor 

and sheave to protect it from the 

weather and prevent inadvertent con-

tact. The mechanical equipment assem-

bly shall be warranted against any fail-

ure caused by defects in materials and 

workmanship for no less than five (5) 

years following the date of tower ship-

ment. This warranty shall cover the fan, 

speed reducer, motor, drive shaft and 

couplings, and the mechanical equip-

ment support. The bearing assemblies 

and V-belts shall be warranted for 18 

months.

 

   Where it is your intention to be able to operate both cells of the tower 

while the flume cover plate is installed, separate outlet connections, 

float valves and overflows must be provided for each cell. Likewise, this 

would require separate sensors and controls for basin heater systems, if 

installed.

   IEC premium efficiency motor with a five year warranty enhances the 

standard five year mechanical equipment warranty of the MD cooling 

tower. 

Содержание Cooling Tower Marley MD

Страница 1: ...Marley MD CoolingTower Engineering Data Specifications...

Страница 2: ......

Страница 3: ...r Distribution System 31 Casing and Fan Guard 31 Access 31 Collection Basin 32 Warranty 32 Specifications Options Stainless Steel Options Stainless Steel Collection Basin 33 All Stainless Steel Coolin...

Страница 4: ...mill galvanized steel construction Factory assembled ensures final field installation will be hassle free Triple pass PVC inlet louvers limits splash out and eliminate sunlight from entering the colle...

Страница 5: ...rs The left hand column of pages 28 through 39 provides appropriate text for the various specification paragraphs whereas the right hand Marley MD CoolingTower 5 column comments on the meaning of the...

Страница 6: ...current drawing from your Marley sales representative The UPDATE web based selection software available at spxcooling com provides MD model recommendations based on customer s specific design require...

Страница 7: ...drain connection is located on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shipping Weight kg H A Weig...

Страница 8: ...VATION 8 INLET C L 569 2578 2371 2794 140 MD5008 MULTICELL Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection softwa...

Страница 9: ...e of the tower A 3 M drain connection is located on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shippi...

Страница 10: ...SIDE ELEVATION END ELEVATION 569 2578 3651 140 Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software available...

Страница 11: ...ion located on the side of the tower A 3 M drain connection is located on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Oper...

Страница 12: ...IDE ELEVATION END ELEVATION 569 2578 3651 3715 140 Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software avail...

Страница 13: ...ion is 2 dia M connection located on the side of the tower A 3 M drain connection is located on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face...

Страница 14: ...LEVATION END ELEVATION 153 MD5016 SINGLE CELL Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software available...

Страница 15: ...e collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shipping Weight kg H A Weight Cell Heaviest Section MD5016PAC1L 317 11 7...

Страница 16: ...ELEVATION END ELEVATION 153 MD5016 TWO OR THREE CELL Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software ava...

Страница 17: ...on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shipping Weight kg H A Weight Cell Heaviest Section MD...

Страница 18: ...ELEVATION END ELEVATION 153 MD5016 FOUR OR MORE CELLS Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software av...

Страница 19: ...on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shipping Weight kg H A Weight Cell Heaviest Section MD5...

Страница 20: ...E ELEVATION END ELEVATION 153 MD5016 FOUR CELL QUAD Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software avai...

Страница 21: ...ote 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shipping Weight kg H A Weight Cell Heaviest Section MD5016PAC4B 317 11 79 4801 3091 5933 3353 1710 MD5016PLC4B 320 11...

Страница 22: ...Model Dimensions Design Operating Weight per cell kg Design Operating Load at support beam kg m W L C D E F MD5008__C 2578 2731 2537 2629 51 165 3072 563 MD5008__D 2578 2731 2537 2629 51 165 3197 586...

Страница 23: ...etin for preliminary layouts only Obtain current drawings from your Marley sales representative for final design 2 Purchaser to provide tower support complete with holes and anchor bolts Do not use st...

Страница 24: ...7 588 305 8 191 477 588 305 10 477 588 305 MD5016 6 477 639 331 8 191 477 639 331 10 216 477 639 331 12 477 639 331 Maximum m3 hr per Outlet Outlet Diameter Side or End Suction pump flow Sump pump flo...

Страница 25: ...tect personnel and the equipment being hoisted 2 All hoisting equipment should be certified and comply with local and national safety regulations NOTE 3 Ensure that slings are of sufficient length so...

Страница 26: ...al supply is 380 415 V 3ph 220 240V 1 ph available as extra cost option Heater has an integral thermostat set point nominally 3 C but adjustable to suit operating requirements Heater components are no...

Страница 27: ...makeup water CAUTION The MD cooling tower must be located at such distance and direction to avoid the possibility of contaminated discharge air being drawn into building fresh air intake ducts The pur...

Страница 28: ...base establishes the type configuration base materi al and physical limitations of the cooling tower to be quoted During the planning and layout stages of your project you will have focused your atten...

Страница 29: ...ality and load carrying capabili ties into account in the selection of their materials of manufacture 6 0 Mechanical Equipment 6 1 Fan s shall be propeller type incorpo rating heavy aluminum alloy bla...

Страница 30: ...an five 5 years following the date of tower shipment This warranty shall cover the fan speed reducer drive shaft and couplings and the mechanical equipment support The electric motor shall carry a man...

Страница 31: ...nly over the fill The branch arms shall be corrosion resis tant PVC with polypropylene spray noz zles attached to the branch arms with a rubber socket connection for ease of removal and cleaning To en...

Страница 32: ...provided in each cell of the tower The basin floor shall slope toward the drain to allow complete flush out of debris and silt which may accumu late Towers of more than one cell shall include steel fl...

Страница 33: ...shall be fabricated of heavy gauge series 300 stainless steel Only low carbon stainless steel alloys will be accepted in order to minimize the risk of intergranular corrosion in the weld zones The to...

Страница 34: ...ph in the Access section A welded aluminum safety cage shall surround the ladder extending from a point approximately 2m above the foot of the ladder to the top of the handrail Periodic inspection and...

Страница 35: ...and remote temperature control devices The temperature controller shall be adjustable for the required cold water temperature If a thermostatic control ler is used it shall be mounted on the side of t...

Страница 36: ...state PI temperature controller to adjust frequency output of the drive in response to the tower cold water temperature The temperature of the cold water and set point shall be displayed on the door o...

Страница 37: ...motor speed The cooling tower manufacturer shall supply VFD start up assistance Tower vibration testing throughout the speed range is required to identify and lockout any natural frequency vibration...

Страница 38: ...igid hot dip galvanized steel structural support that resists misalignment between the motor and sheaves pulleys For belt drive towers with motors inside the airstream motors shall be mounted on an ad...

Страница 39: ...reas of the world but the need to avoid cycling may cause the cold water temperature to vary significantly Variable speed drives automatically minimize the tower s noise level during periods of reduce...

Страница 40: ...8AB UNITED KINGDOM 44 0 1905 720 200 info uk spx com spxcooling com In the interest of technological progress all products are subject to design and or material change without notice 2008 SPX Cooling...

Отзывы: