![SPT Labtech apricot S1 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/spt-labtech/apricot-s1/apricot-s1_user-manual_1352391007.webp)
© 2021 SPT Labtech Ltd
6
1.2
– Inspection and Set-Up
Care should be exercised when unpacking the crate.
o
Inspect the instrument for any visible damage that may have occurred during
shipping.
After confirming that there is no damage you can start the installation of the apricot
S1.
o
Re-assemble and save the shipping crate for future use.
o
We recommend that you read through the Operating Instructions Manual before
you start the install process.
o
Place the instrument on a sturdy and level surface.
o
Use appropriate caution when operating this instrument.
o
Verify that the ON/OFF switch is in the OFF position.
o
Using the power cord provided connect the instrument entry connector and
connect the opposite end to a power outlet with a ground connection.
o
The instrument is ready to turn on. Press the ON/OFF switch to the ON position.
DO NOT PLUG IN OR TURN ON
THE SYSTEM
Contact SPT Labtech immediately
–
take a picture of the damage
and
send it to
[email protected], and
contact the freight carrier.
Содержание apricot S1
Страница 1: ...apricot S1 user guide...
Страница 2: ...2021 SPT Labtech Ltd 1 Notes...
Страница 10: ...2021 SPT Labtech Ltd 9 2 Features...