Z03
L09
J02R/L
Z02
T08
1
2
3
2
QTY.
NO.
PART
L09
2
J01
2
J02R/L
2/2
16
12
Z02
Z03
T08
4
L09
3
3
1 1
1
1 1
1
2
3
Ø
4X16D
Ø
5X30
J07
J08
4
4
T08
J07
T08
Z02
J 08
J01
J01
Drill one hole on both
L01A & D approx 500mm up
from the bottom, Dia. 3.2mm,
then tighten J08 with Z02,
and push T08 into the channel
To avoid leaking,
using silicone on
J02R / L, T08 and J07
of J08 (see Fig. above).
is an option
(see Fig. above).
28
Install the L09 gutter profile over the edges of
the panels, ensuring the rubber strip seals
against the panels. Then fix into place with
the Z03 screws, do not over tighten.
Содержание GRANGE-4,3000
Страница 19: ...19 1 2 L03E L03F QTY NO PART L03E 1 L03F 1 Y2 Y2 L03E L03F 1 2 Y2 2...
Страница 22: ...22 2 1 3 L01B D F L01B L01C L01C E L01B L01B L01C L01C 1 1 2 2 3 3 QTY NO PART L01B 2 L01C 2 F 2...
Страница 23: ...23 2 W01 L01B W01 L01C 3 QTY NO PART 26 M01 1 24 S01 L06 W01 6 L06 L06 M6X12 M6 L06 1 1 3 3 2 2 1 1...
Страница 30: ...2 30 1 2 3 L05D 4 L05D 1 L05D 3 QTY NO PART 8 M01 L05D 4 8 S01 M6X12 M6 4 4...