background image

Page 1 of 4 

 

 

GrowersSolution.com 

 

931.528.3390

 

 

DAKOTA GREENHOUSE INSTALLATION 

 

!!!! CAUTION: Tubing ends may be sharp!!! 

 

Read directions completely before beginning assembly.

  We recommend that you visit The Learning Center at 

www.growerslearning.com

click on How to Assemble under categories. In this section you will find video tutorials 

to assist you with the assembly of your new greenhouse.  If you have ANY questions please give us a call at  
866-928-3390.

 

 

 

Step 1 – Ground Stakes

   

 

Square the corner stakes with each other.  Take all 
measurements on the outer edge of pipe. 

 

Drive Corner stakes 18 inches in ground and then drive rest of 
stakes 

4 ft. centers

 (Fig 1.1). 

 
NOTE:

  Use a large bolt and washer,  or 2 x 4 on top of stakes to drive  

              them into the ground. 

 

Fig 1.1 Ground Stakes

 

 

 

Step 2 – Bow Assembly

   

 

Place bow sections on flat ground. 

 

Slide sections together (Fig 2.1), and secure at joints with 

self-

tapping 

screws that are provided (Fig 2.2). 

 

Measure up each end of bow 6 inches and make a reference 
mark.  The mark is how far the bow slides into the ground stake.  
Each bow is 7 pieces total; 3 angular, 2 side wall uprights, and 2 
gable pieces.

 

 

Fig. 2.1 

 

Fig 2.2 Bow Assembly

 

 

 

 

Содержание DAKOTA

Страница 1: ...are the corner stakes with each other Take all measurements on the outer edge of pipe Drive Corner stakes 18 inches in ground and then drive rest of stakes 4 ft centers Fig 1 1 NOTE Use a large bolt and washer or 2 x 4 on top of stakes to drive them into the ground Fig 1 1 Ground Stakes Step 2 Bow Assembly Place bow sections on flat ground Slide sections together Fig 2 1 and secure at joints with ...

Страница 2: ...t inside of the house Fig 4 2 Make sure to view illustrations NOTE The TEK screw is drilled through the 2 hole strap in Fig 4 3 This secures the end of purlin to greenhouse Fig 4 1 Center of Bow Fig 4 2 Sidewalls Fig 4 3 2 Hole Strap Fig 4 4 Purlin Clamp Step 5 Base Boards Attach base boards 2 x 6 pressure treated recommended on the bottom of the sidewall outside of house with supplied 2 hole pipe...

Страница 3: ...he bow Using TEK screws install header with corner braces and header tie The installation of the rear end wall is the same However header upright spacing can be adjusted to accommodate a fan or vent if you choose to install one Fig 6 1 Fig 6 2 Fig 6 3 Step 7 Wire Lock NOTE Not all houses use wire lock Some use batten tape and staples Attach the Wire Lock Channel on the top of first bow and last bo...

Страница 4: ... into the channel on top of the plastic Fig 8 1 NOTE Please watch the video online for more information Fig 8 1 Wire Lock Film Installation Additional Information Concerning Weather During windy stormy winter conditions it is mandatory to roll sides down and wire lock ends Lack of doing this may result in greenhouse damage due to wind uplift If you are expecting sever snow 6 inches plus you should...

Отзывы: