background image

511-113 Vault Bar 

Page 3 of 3 

Rev 8/5/08 

GENERAL ASSEMBLY INSTRUCTIONS: 

 
Only hand-tighten nuts & bolts on initial assembly.  Final tightening should be done 
EVENLY after final assembly when unit has been plumbed & leveled.   
After assembly is complete, ANY ENDS OF BOLTS PROTRUDING BEYOND NUTS SHOULD BE CUT OFF 
AND/OR PEENED OVER TO REMOVE ANY SHARP EDGES.  Go over entire unit to file smooth any 
sharp edges or projections that may have been caused by rough handling in shipping or 
installation. 
 

GENERAL MAINTENANCE INSTRUCTIONS: 

 
Check MONTHLY for loose bolts, damaged or broken parts.  Tighten and/or replace 
immediately.    
 

SPECIFIC ASSEMBLY INSTRUCTIONS: 

 

NOTE: 

All threaded ends of bolts protruding beyond nuts must be cut off and/or 
peened to eliminate sharp edges.  No more than two threads should extend 
beyond face of nut. 
All washers, “T” nuts, and other fastener hardware used on round pipe or 
tubing must be hammered down to conform to the curved underlying surface to 
eliminate catch points.   
 

STEP #1: 

Mark & dig footing holes per Footing Diagram on PAGE #2. 
 

STEP #2: 

Stand up & brace in footing holes.  Length of pipe below intended level of 
resilient surfacing should be 24”.  Two long braces holding 2 legs each are 
recommended.   
 

STEP #3: 

Plumb & level entire unit.  Pour Concrete.  Tighten all nuts & bolts so that 
lock washers are flat.  Wait 48 hours before removing braces, installing 
Resilient Surfacing & using equipment. 
 

STEP #4: 

Attach Warning Label and Manufacturer’s Identification Label to a clean 
surface.  The Labels should be attached in a location where they are clearly 
visible and legible and away from normal hand and foot placement areas.  The 
Labels must be replaced if they become illegible, destroyed or removed.  
Contact your distributor for replacement Labels. 

 

Отзывы: