581-218 8’ PRIMARY BIPOD SWING
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__11)
Once the concrete has set
, back fill dirt over the footing
holes; inspect the area and components for tools, hazardous debris
and sharp edges. Verify all components are installed and all
hardware is tight and then install the safety surfacing.
__12)
Inspect the components:
for sharp edges and if necessary
file them down and apply touch up paint.