background image

 
  
 

November 15,2018  

 

 

301-147 8’ WHEELCHAIR ACCESSIBLE MGR 

INSTALLATION INSTRUCTION 

 

PARTS LIST 

ID  PART # 

DESCRIPTION 

QTY 

913-807-L  ADA 8’ QTR DECK LEFT 

913-808-L  ADA MAIN HANDRAIL LFT   2 

913-806 

8’ MGR Post Assembly 

336-067 

Center Hub Disk for 8’ MGR 

913-803 

8’ MGR Hub Assembly 

913-804 

8’ MGR Support Arm 

336-029 

1” Ball Bearing 

336-030 

Grease Fitting 

316-801Z 

1/2” Flat Washer Zinc 

10  226-802Z 

1/2” Nylon Lock Nut Zinc 

11  126-810 

1/2 x 4” Carriage Bolt 

12  126-701 

bps 

3/8 x 1 1/4” Button Head Bolt 

72 

13  316-601 

3/8” Flat Washer 

160 

14  226-602 

3/8” Nylon Lock Nut 

84 

15  416-505 

bpk 

7/32” Socket Key 

16   

Hand Rail Touch-up Paint 

17  126-707 

3/8 x 1 1/2” Button Head Bolt 

18  913-807-R  ADA 8’ QTR DECK RIGHT 

19  913-808-R  ADA MAIN HANDRAIL RT 

 

PARTS LIST CONTINUED 

ID  PART # 

DESCRIPTION 

QTY 

20  913-809-L  ADA GATE LEFT 

21  913-809-R  ADA GATE RIGHT 

22  913-810 

ADA UPPER HANDRAIL 

23  913-811 

ADA PERIMETER RING 
SECTION 

24  913-812 

MAINT ACCESS PANEL 

25  905-007 

ADJ FOOT FOR RING 

12 

26  317-340 

CHAIN (RING ANCHOR) 

27  342-506 

D-SHACKLE (RING 
ANCHOR) 

28  905-006 

TURNBUCKLE (RING 
ANCHOR) 

29  905-520 

ANCHOR SPIKE (RING 
ANCHOR) 

30  302-506 

T-CLAMP 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание 301-147

Страница 1: ...owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently Periodic Inspections maintenance repair and replacement of damaged parts is necessary for the safe operation and use of the equipment A maintenance section that includes component specific maintenance requirements is included at ...

Страница 2: ...6 701 bps 3 8 x 1 1 4 Button Head Bolt 72 13 316 601 3 8 Flat Washer 160 14 226 602 3 8 Nylon Lock Nut 84 15 416 505 bpk 7 32 Socket Key 2 16 Hand Rail Touch up Paint 1 17 126 707 3 8 x 1 1 2 Button Head Bolt 8 18 913 807 R ADA 8 QTR DECK RIGHT 2 19 913 808 R ADA MAIN HANDRAIL RT 2 PARTS LIST CONTINUED ID PART DESCRIPTION QTY 20 913 809 L ADA GATE LEFT 2 21 913 809 R ADA GATE RIGHT 2 22 913 810 AD...

Страница 3: ...WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION IMPORTANT UNIT IS DESIGNED FOR POUR IN PLACE RUBBER SAFETY SURFACING OR RUBBER MATS USE OF ANY OTHER SAFETY SURFACING WILL VOID THE MANUFACTURERS WARANTY AND COULD CAUSE AN INJURY ...

Страница 4: ...November 15 2018 4 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Страница 5: ...p is for the merry go round post It installs the same as a standard post but as this unit is flush mount the depth of that hole from the surface is greater Once the excavation has been completed you can install the post and drainage 1 Post depth is 5 from the top of the planned finished height of the safety surfacing the main excavation is 12 wide down to 2 the remaining width for the post is 3 at...

Страница 6: ...November 15 2018 6 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Страница 7: ...ETY SURFACING WILL VOID THE MANUFACTURERS WARANTY AND COULD CAUSE AN INJURY Apply Loctite to all bolts during assembly prior to completely tightening them Do not use impact gun as Stainless Steel hardware can occasionally be difficult to use particularly if you need to take them out to make an adjustment It is recommended that you add a drop of oil to bolts that may have to be removed before you i...

Страница 8: ...November 15 2018 8 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION EXCAVATION AND FOOTING VIEW SIDE VIEW ABOVE TOP DOWN RIGHT ...

Страница 9: ...e perfectly level in all directions before adding concrete for safety and durability of product __3 Add concrete to hole crown the top of the concrete down and away from the post to help prevent water build up around the post Periodically check the post to ensure it is level while concrete is curing Brace the post into position if necessary Before installing remaining MGR components wait till conc...

Страница 10: ...om one to the other so that the same decks are placed diagonally When tightening the bolts move around the entire unit and tighten them evenly to ensure the deck sections are properly aligned and to ensure there are no gaps between the deck sections Connect the support arm 6 to the deck sections as well as the deck sections to each other using 1 1 4 bolts 12 3 8 washers and 3 8 nuts Refer to Detai...

Страница 11: ...rail __11 Once all four handrails have been positioned attach the Upper Handrail 22 to the four handrails using two T clamps at each location and securing in position by inserting a 5 16 x 1 1 2 Button Head bolt through a 5 16 flat washer a T clamp the handrail another T clamp and into a 16 x 1 button head not When the T clamp is in position on the main handrail tighten bolts Repeat at all four ma...

Страница 12: ...form and help hold the ring in position when backfilling Maintaining separation between the ring and platform is essential in allowing the platform to spin We also have holes on the bottom ring flange which additional anchor spikes or even concrete anchors if you wish to install footings can be driven through once leveled to help hold the ring in position __13 If using any material under feet have...

Страница 13: ...November 15 2018 13 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Страница 14: ...November 15 2018 14 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Страница 15: ...November 15 2018 15 301 147 8 WHEELCHAIR ACCESSIBLE MGR INSTALLATION INSTRUCTION ...

Страница 16: ...kfill the area up to the ring We recommend that you fill and pack the area directly against the ring and around each turnbuckle and chain anchor by hand to prevent shifting and to ensure they are properly filled Backfill to the height needed for the surfacing and surfacing base After the area has been backfilled you will then install the safety surfacing Use images on previous page as a reference ...

Отзывы: