1-2. Use hardware (61,62,63,64,92,93) to secure the main frame (5) to the seat frame
(29).
1-3. Use hardware (62,63,64,73) to secure the seat frame (29) to the mast (21).
1-4. Thread the cable through the main frame (5). Attach the horizontal beam (22) to the
main frame (5) and the mast (21) as shown.
1-5. Use hardware (62,63,64) to loosely secure the horizontal beam (22) to the main
frame (5) and the mast (21).
-9-
Содержание DF-103
Страница 1: ......
Страница 4: ...2 2 1 DIMENSIONS CHAPTER 2 INSTRUCTIONS...
Страница 9: ...7 CHAPTER 3 ASSEMBLY INSTRUCTIONS STEP 1 Connector Installation...
Страница 13: ...Weight Plate Installation STEP 2 11...
Страница 15: ...13 2 2 Remove hardware 67 68 69 Guide the guide rods 70 downward as shown...
Страница 19: ...17 2 7 Tilt the guide rods 70 back into place...
Страница 20: ...18 2 8 Lift the guide rods 70 up into their mounting station Then secure them with hardware 67 68 69...
Страница 21: ...STEP 3 19 Weight Stack Sticker Application...
Страница 23: ...STEP 4 21 Cable Installation 4 1 Secure the cable to the upper stack carriage as shown...
Страница 25: ...STEP 6 23 Press Yoke Installation...
Страница 27: ...6 3 Once the axle is in place secure it with hardware 78 79 80 97 6 4 Use scissors to cut the zip tie 25...
Страница 29: ...27...
Страница 30: ...STEP 8 28 Lat Pull Bar and Bracket Installation...
Страница 36: ...STEP 12 34 Front Top Cover Installation Use screws 45 to secure the front top cover onto the stack tower...
Страница 45: ...43 Chest Press Mid Row...