-8-
Step 3: Installing console onto uprights
Use six M8 × 1.25 × 12L Socket Head Cap Bolts (146) to secure the console on interface
mounting bracket on uprights (3, 4).
Connect upper computer cable (41) and lower computer cable (42), upper TV Signal Cable
(170) and lower TV Signal Cable (171), upper Console Power Cord(172) and lower Console
Power Cord (173)
、
upper network W/Cable (174)and lower network W/Cable (175)
、
upper
CSAFE W/Cable (176)and lower CSAFE W/Cable (177)
、
upper HDMI Cable (180) and lower
HDMI Cable (181)
Use six 3/8"-16 × 3/4" Button Head Socket Bolts (145), together with six 3/8'' × 16.5 × 2.0 × 4H
Split Washers (117) and six 3/8" × 25 × 2T Flat Washers (125) on top of uprights.
Be careful not to pinch the computer cable.
Содержание CT850 ENT
Страница 25: ... 24 Army Navy Air Force ...
Страница 26: ... 25 Marines Physical Efficiency Battery PEB For U S Federal Law Enforcement US Coast Guard ...
Страница 34: ... 33 EXPLODED VIEW DIAGRAM ...