4
Spirax Sarco Applications Engineering Department
Toll Free at: 1-800-833-3246
SPIRAX SARCO, INC. • 1150 NORTHPOINT BLVD. • BLYTHEWOOD, SC 29016
PHONE 803-714-2000 • FAX 803-714-2222 • WWW.SPIRAXSARCO.COM/US
Warning:-
To avoid the risk of scalding, it is essential that a full flow of
cooling water is present before opening the sample inlet valve.
Always close the sample inlet valve before turning off the cooling
water.
Sample pipework becomes very hot under normal working
conditions, and will cause burns if touched.
Follow this procedure for safe operation and accurate sampling:-
-
Open the cooling water inlet valve first and ensure that a full flow
can be seen at the cooling water outlet.
-
Gradually open the sample inlet valve and regulate the flow to
achieve a cooled sample at about 77°F (25°C).
-
Allow the sample to run for a while before collection. This will
ensure that a true sample is collected for analysis.
-
When enough liquid has been collected close the sample inlet first,
and then the cooling water inlet valve.
-
After closing the sample inlet valve the sample OUT connection
may drip for a few minutes while the coil drains.
4. Commissioning
5. Operation
6. Maintenance
7. Spare parts
After installation or maintenance carry out tests to ensure that the system is fully functional.
No routine maitenance is required.
The following components are available as spares:
Component
Stock no.
Stud coupling stainless steel BSP
0963243