![Spirax Sarco LP30 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/spirax-sarco/lp30/lp30_installation-and-maintenance-instructions-manual_1347888019.webp)
IM-P402-44
AB Issue 15
19
Verification Signatures
Clearance
Checking
Date
Reason for test
14 mm ( ") wires Independent
or more
removed
assessor
- WARNING:
It is essential to remove the checking wires from the probe before
commissioning the boiler or vessel. Failure to do this could stop the low water alarms
operating.
-
The person who removes the checking wires must sign the record sheet to verify that this has
been completed.
- Independent assessor:
It is strongly recommended that an independent person (who might
be an Insurance Inspector, for example) verifies:
-
That the test has been carried out.
-
That the checking wires have been removed.
-
That the record sheet has been correctly completed by a competent person.
Содержание LP30
Страница 2: ...IM P402 44 AB Issue 15 2 ...