2. General product information

The Spirax Sarco LC2300 is used to control the positioner of a pneumatic valve in response to
a signal from a capacitance probe, providing proportional modulating control of liquid levels.
The LC2300 can also be used with any two-wire 4 - 20 mA transmitter, for example for pressure,
temperature, or level control using a pressure or differential pressure transmitter.
Reverse acting or direct output can be selected.

The controller has a mains on LED, and two level indicators:-

The green LED (>50%)

Indicates that the output current is greater than 50%,
i.e. above the set point output current.

The amber LED (>100% / < 0%)

Indicates that the output is greater than 20 mA
or less than 0 / 4 mA.

A three stage wave filter gives an averaged output, maintaining a stable signal under the very
wide variations in turbulence found in tanks and high output boilers.
The LC2300 is set up before installation to suit the mains supply voltage and to provide the
required functions, using internal switches. See Section 4.1, 'Setting up the controller'. Calibration
can be altered without removing or dismantling the unit, using the set point and proportional band
potentiometers on the front panel.

Fig. 1

Power on

Green LED

Amber LED

Set point

Proportional band

LC2300

>50%

>100%

<0%

Clamping screw

Clamping screw

Archive

Содержание LC2300

Страница 1: ...e Instructions IM P402 72 AB Issue 6 4025350 6 1 General safety information 2 General product information 3 Installation 4 Setting up the controller 5 Wiring diagrams 6 Commissioning 7 Maintenance 8 F...

Страница 2: ...em An independent high water alarm system must be fitted if it is considered a safety requirement In this case the relays must simultaneously isolate the feedwater supply and the boiler heat supply at...

Страница 3: ...ut current is greater than 50 i e above the set point output current The amber LED 100 0 Indicates that the output is greater than 20 mA or less than 0 4 mA A three stage wave filter gives an averaged...

Страница 4: ...ntain the integrity of the approval Maximum power consumption 6 VA 0 2 V Input 1 0 6 V Selectable inputs 0 20 mA 4 20 mA Input 2 opposite sense to input 1 0 20 mA 4 20 mA Note See separate literature...

Страница 5: ...nt For the US and Canadian markets the controller must be wired in accordance with the National and Local Electrical Code NEC or Canadian Electrical Code CEC The controller and all connected circuits...

Страница 6: ...switches to the positions shown in Figure 3 for the chosen functions Replace the printed circuit board Ensure that the LEDs engage with the holes in the front panel Replace the rear cover panel Note t...

Страница 7: ...aves and high turbulence may otherwise cause continuous oscillation of the output signal giving over frequent valve movement The unit is supplied set to Filter 1 position the least damped response wit...

Страница 8: ...earth A functional earth is used in order for the product to operate In this application the earth tank boiler shell is used as the common of the probe preamplifier It also provides a sink drain for a...

Страница 9: ...rown Red Black LC2300 controller Screen Screen Fig 4 5 2 Wiring diagram standard version 4 20 mA Test Connect ammeter between Terminals 5 and 6 Do not disconnect loop This earth terminal is internally...

Страница 10: ...ng to a 4 20 mA level transducer The controller can be connected to a self powered or loop powered 4 20 mA level transducer instead of a capacitance probe Connect wiring as shown in the Figures 6 and...

Страница 11: ...are shown Wiring connections for other Spirax Sarco controllers transmitters are different and are given in the individual Installation and Maintenance Instructions Fig 8 Capacitance probe source Fig...

Страница 12: ...g or maintenance of the controller is necessary Boiler water level controls and level alarms however do require testing and inspection General guidance is given in the UK Health and Safety Executive G...

Отзывы: