background image

IM-P402-129 

 EMM Issue 7

9

2.5 View parameter mode 

Press the   button in run mode to view and step through the parameters selected. Each 

parameter will remain on view for a further 2 minutes unless the button is pressed again.

2.6 Alarm / error display messages

If an error occurs, an error menu 'ErX' will be displayed at the end of the parameter screens. 

Pressing and holding the 

OK

 button for 3 seconds can clear a message and re-energize the 

alarm relay(s). If the cause has not been corrected, the same error message will reappear. 

If the error or alarm is of a latching type, only the message will disappear. The alarm relay 

will remain de-energised until the correct passcode is entered in the commissioning menu. 

If more than one error or alarm has occurred, the next message will appear (in priority order) 

after the previous one has been cleared. See Section 9 - Fault finding.

2.7 Equipment delivery, handling and storage

Factory shipment

The product is tested, calibrated and inspected prior to shipment, to ensure reliable operation.

Receipt of shipment

Each carton should be inspected at the time of delivery for possible external damage. Any 

visible damage should be recorded immediately on the carrier’s copy of the delivery slip.

Each carton should be unpacked carefully and its contents checked for damage. If it is found 

that some items have been damaged or are missing, notify Spirax Sarco immediately and 

provide full details. In addition, damage must be reported to the carrier with a request for 

their on-site inspection of the damaged item and its shipping carton.

Storage

If the product is to be stored for a period prior to installation, the environmental storage 

conditions should be at a temperature between 0

 

°C and 65

 

°C (32

°

F and 149

°

F), and between 

10% and 90% relative humidity (non-condensing).

Before installing and connecting the power ensure there is no condensation within the unit.

Operators instructions

An alternative operator instruction manual, in place of this manual, for operating the equipment 

is required. This will avoid the commissioning menu passcode being disclosed to the operator.

The alarm reset passcode may optionally be disclosed if this is deemed necessary.

Содержание LC1350

Страница 1: ...tered the display will show the main menu structure Select End to leave the menu Once in the commissioning mode press the button to scroll through the menus to increase digits when in a menu Press the...

Страница 2: ...hese instructions must be stored in a safe place near the product installation at all times Warning This product complies with Electromagnetic Compatibility Directive 2014 30 EU and all its requiremen...

Страница 3: ...en the tips and earth Each probe must be connected to an independent controller The alarm relays must isolate the boiler heat supply at low alarm status A high water alarm may be part of the water lev...

Страница 4: ...unction correctly Not used to provide electrical safety Clean earth ground Safety earth Caution risk of electric shock Caution risk of danger refer to accompanying documentation Optically isolated cur...

Страница 5: ...g gear if required 1 3 Lighting Ensure adequate lighting particularly where detailed or intricate work is required 1 4 Hazardous liquids or gases in the pipeline Consider what is in the pipeline or wh...

Страница 6: ...d to assess the risks taking into account the task the individual the load and the working environment and use the appropriate handling method depending on the circumstances of the work being done 1 1...

Страница 7: ...part or in any manner or form other than as expressly granted here without the prior written consent of Spirax Sarco Limited 2 1 General description The LC1350 is an on off level controller for condu...

Страница 8: ...alarm Alarm Indicates the alarm relay has been de energised released Note The pump status display is not shown if an alarm condition is present The operator is testing the alarm relay or or The level...

Страница 9: ...ipment to ensure reliable operation Receipt of shipment Each carton should be inspected at the time of delivery for possible external damage Any visible damage should be recorded immediately on the ca...

Страница 10: ...n off control from two conductivity probes 3 4 Other features Additional delays can be selected to increase the damping effect for turbulent conditions To prevent unwanted or inadvertent changes being...

Страница 11: ...ead by the operator Warning The boiler control panel or enclosure doors must be kept closed at all times unless installation or maintenance work is being carried out 4 1 Environmental conditions Insta...

Страница 12: ...utout Minimum panel thickness 1 mm if the bezel is used The product has integral threaded inserts M4 x 0 7 at the top and bottom of the front panel Two M4 x 25 mm screws are provided together with fib...

Страница 13: ...IM P402 129 EMM Issue 7 13 4 2 mm 10 mm 22 mm Fig 3 Chassis plate panel cutout diagram 112 mm 67 mm 10 mm 45 mm 92 mm 22 5 mm 4 2 mm 15 mm 4 2 mm 4 2 mm 120 mm 8 mm 112 mm 120 mm...

Страница 14: ...on for overcurrent protection and primary isolation 4 Overcurrent protection devices rated at 3 amps must be included in all phase conductors of the installation wiring If overcurrent protection is in...

Страница 15: ...live and neutral wire together If one wire becomes loose the other wire will prevent it from touching accessible parts 12 A disconnecting device switch or circuit breaker must be included in the buil...

Страница 16: ...d 5 4 Double or reinforced insulation must be maintained between Hazardous live conductors mains and relays circuits and Safety extra low voltages All other components connectors conductors 5 The wiri...

Страница 17: ...minals Input 3 A fuse Input Norm 1 2 3 4 5 6 7 8 9 10 11 3 A fuse L 3 A fuse 3 A fuse N N N Norm Input N ac supply Control relay Alarm 1 relay Back Front Alarm 2 relay Alarm lamp or bell Alarm lamp or...

Страница 18: ...uire a protective earth A functional earth is used in order for the product to operate In this application the earth is used as a sink or drain for any electrical interference The earth terminal must...

Страница 19: ...alarms Fig 10 LP10 4 Pumping out with two high alarms Signal circuit View from the top Front 50 51 52 53 54 55 56 LP10 4 Connect to a clean local earth in the panel Fig 8 Signal circuit LP10 4 Pumpin...

Страница 20: ...a spring loaded or a key operated switch is recommended Signal circuit View from the top 50 Alarm 1 High alarm test switch normally open 51 52 53 54 55 56 Pump tip HI Pump tip LO Alarm 2 Com Screen E...

Страница 21: ...tons are not pressed for over 5 minutes the controller will revert to run mode and an error will be displayed If the commissioning was incomplete the controller may not provide the correct control Fig...

Страница 22: ...ection 6 3 1 Main menu structure to make the changes required 6 3 1 Main menu structure selects off hi or lo alarm signal selects off hi or lo alarm signal selects off pumping in or pumping out select...

Страница 23: ...Delay To damp the input signals to avoid over frequent switching in turbulent conditions A time delay of 2 4 8 or 16 seconds of time can be selected These affect both alarms and the pump channel Selec...

Страница 24: ...for further details 8 Maintenance Note Read the Safety information in Section 1 before doing any maintenance No special servicing preventative maintenance or inspection of the product is required Duri...

Страница 25: ...ult finding procedures are not carried out in line with this manual Relay fuses to be replaced by manufacturer or accredited service department During installation or maintenance the rear of the produ...

Страница 26: ...Investigate and rectify any faults in the wiring external sensors transducers and modules associated with that connection Explanation The internal power supply is unable to power up If the voltages c...

Страница 27: ...ommissioning mode if required 3 Alarm 1 A high or low water alarm has occurred 1 Check the boiler operation 2 Check the boiler set up and operation of alarm and boiler water supply systems 4 Alarm 2 A...

Страница 28: ...ly packed for transit preferably in the original cartons Please provide the following information with any equipment being returned 1 Your name company name address and telephone number order number a...

Страница 29: ...enclosure Minimum of IP54 or UL50 NEMA Type 3 3S 4 4X 6 6P or 13 See Section 4 Mechanical installation Enclosure rating front panel only NEMA type 4 hose down only UL approval and IP65 verified by TRA...

Страница 30: ...12 AWG Stripping length 5 6 mm Caution Use only the connectors supplied by Spirax Sarco Ltd Safety and Approvals may be compromised otherwise Level probe cable wire Type High temperature Shield type...

Страница 31: ...r load HP 2 9 amp 250 Vac 1 10 HP 3 amp 120 Vac Pilot duty load C300 2 5 amp control circuit coils Electrical life operations 3 x 105 or greater depending on load Mechanical life operations 30 x 106 I...

Страница 32: ...ettings AL1 Alarm select Ranges OFF hI or LO Default hI AL2 Alarm select Ranges OFF hI or LO Default LO PU Pumping action Ranges OFF In or Out Default In Input Ranges 0 2 4 8 or 16 Default 0 Units Sec...

Страница 33: ...Data registers Parameters and register data Register Parameters 0 5 Identity 1 Pump alarm status 2 Alarm 1 and alarm 2 3 Pump 4 5 6 7 8 9 The format of the register data is 16 bit integer with the mo...

Страница 34: ...M P402 129 EMM Issue 7 34 12 Menu map OK ENTER PASS CODE AL1 dEL Int End On OFF Normal run mode display with pump off Press the OK button for 5 seconds AL2 Pu In Out OFF 8 16 4 2 0 hl LO OFF LO OFF hl...

Страница 35: ...IM P402 129 EMM Issue 7 35...

Страница 36: ...IM P402 129 EMM Issue 7 36...

Отзывы: