background image

IM-P180-31 

CMGT Issue 11

3

Safe operation of these products can only be guaranteed if they are properly installed, commissioned, 

used and maintained by qualified personnel (see Section 1.11) in compliance with the operating 

instructions. General installation and safety instructions for pipeline and plant construction, as 

well as the proper use of tools and safety equipment must also be complied with.

1.1 Intended use

Referring to the Installation and Maintenance Instructions, name-plate and Technical Information 

Sheet, check that the product is suitable for the intended use/application.

The products listed below comply with the requirements of the Pressure Equipment Directive (PED) 

and all fall within category 'SEP'. It should be noted that products within this category are required 
by the Directive not to carry the 

 mark.

i)  The product has been specifically designed for use on steam, air or water/condensate which 

is in Group 2 of the above mentioned Pressure Equipment Directive (PED). The products’ use 

on other fluids may be possible but, if this is contemplated, Spirax Sarco should be contacted 

to confirm the suitability of the product for the application being considered.

ii)  Check material suitability, pressure and temperature and their maximum and minimum values. 

If the maximum operating limits of the product are lower than those of the system in which it 

is being fitted, or if malfunction of the product could result in a dangerous overpressure or 

overtemperature occurrence, ensure a safety device is included in the system to prevent such 

over-limit situations.

iii)  Determine the correct installation situation and direction of fluid flow.

iv)  Spirax Sarco products are not intended to withstand external stresses that maybe induced by 

any system to which they are fitted. It is the responsibility of the installer to consider these 

stresses and take adequate precautions to minimise them.

v)  Remove protective covers from all connections and protective film from all name-plates, where 

appropriate, before installation on a steam or other high temperature applications.

1.2 Access

Ensure safe access and if necessary a safe working platform (suitably guarded)before attempting 

to work on the product. Arrange suitable lifting gear if required.

1.3 Lighting

Ensure adequate lighting, particularly where detailed or intricate work is required.

1.4 Hazardous liquids or gases in the pipeline

Consider what is in the pipeline or what may have been in the pipeline at some previous time. 

Consider: flammable materials, substances hazardous to health, extremes of temperature.

1.5 Hazardous environment around the product

Consider: explosion risk areas, lack of oxygen (e.g. tanks, pits), dangerous gases, extremes of 

temperature, hot surfaces, fire hazard (e.g. during welding), excessive noise, moving machinery.

1. Safety information

Содержание BT6-B

Страница 1: ...product information 3 Installation 4 Commissioning 5 Operation 6 Spare parts and maintenance Copyright 2019 Printed in GB 1802950 11 BT6 B Sanitary Balanced Pressure Thermostatic Steam Trap Installat...

Страница 2: ...IM P180 31 CMGT Issue 11 2...

Страница 3: ...e product are lower than those of the system in which it is being fitted or if malfunction of the product could result in a dangerous overpressure or overtemperature occurrence ensure a safety device...

Страница 4: ...or processed as persons inhaling the fumes from burning tobacco contaminated with PTFE particles can develop polymer fume fever 1 9 Tools and consumables Before starting work ensure that you have suit...

Страница 5: ...re is taken Viton Can be landfilled when in compliance with National and Local regulations Can be incinerated but a scrubber must be used to remove Hydrogen Flouride which is evolved from the product...

Страница 6: ...or example critical SIP applications please consult Spirax Sarco Standards The BT6 B has been designed and built in general accordance with ASME BPE The unit also complies with the requirements of the...

Страница 7: ...IM P180 31 CMGT Issue 11 7 Fig 1 2 2 Sizes and pipe connections 1 and 1 sanitary clamp ends to ASME BPE For other end connections please consult Spirax Sarco...

Страница 8: ...co Body design condition PN10 PMA Maximum allowable pressure 10 bar g 140 C 145 psi g 284 F TMA Maximum allowable temperature 177 C 9 2 bar g 350 F 133 psi g Minimum allowable temperature 254 C 425 F...

Страница 9: ...self draining Check flow arrow for correct orientation Fittings clamps and gaskets for pipe end connections are not supplied Do not expose the element to superheat conditions since over expansion may...

Страница 10: ...ent The operation relies on a stainless steel capsule that is filled with a temperature sensing fluid During cold or start up conditions the capsule will be fully open allowing large volumes of air co...

Страница 11: ...These are the available spare parts No other parts are supplied as spares Capsule element assembly 3 and 5 Seal 5 Body outlet including seat 2 How to order spares Always order spares by using the des...

Страница 12: ...carefully to ensure that the machined surfaces are not damaged Remove the sanitary clamps from the pipeline connections and remove the whole trap from the pipeline Remove the body sanitary clamp 4 th...

Отзывы:

Похожие инструкции для BT6-B