![Spirax Sarco BT6-B Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/spirax-sarco/bt6-b/bt6-b_installation-and-maintenance-instructions-manual_1347894010.webp)
IM-P180-31
CMGT Issue 11
10
After installation or maintenance ensure that the system is fully functioning. Carry out tests on any alarms
or protective devices.
Note:
As with all steam systems it is very important that the pressure is built up slowly to avoid possible
damage to any sensitive equipment.
The operation relies on a stainless steel capsule that is filled with a temperature sensing fluid. During cold or
start-up conditions the capsule will be fully open allowing large volumes of air, condensate and/or CIP fluid
to be drained. As the system approaches steam temperature the fluid in the capsule expands and the valve
closes the trap to prevent live steam loss. This closure occurs very close to steam temperature to ensure
efficient drainage of the system.
4. Commissioning
5. Operation
Содержание BT6-B
Страница 2: ...IM P180 31 CMGT Issue 11 2...